说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 后压浆法
1)  mud-jack method
后压浆法
1.
Discussion on several problems concerning mud-jack method of driven cast-in-place pile;
对灌注桩后压浆法若干问题的探讨
2)  Cement grouting after well completion
孔底后压浆法
3)  post-grouting
后压浆
1.
On the application of bored cast-in-situ pile post-grouting technology in certain engineering;
钻孔灌注桩后压浆技术在某工程中的运用
2.
Construction quality control measures of post-grouting reinforced concrete casting pile;
后压浆钢筋混凝土灌注桩施工质量保证措施
3.
Impacting mechanism of post-grouting;
钻孔灌注桩后压浆作用机理分析
4)  post-compression grouting
后压灌浆
5)  post pressure grouting
后压浆
1.
On the project application of the post pressure grouting technique for cast-in-place bored piles
钻孔灌注桩后压浆技术的工程实践
2.
The bearing capacity characteristic value of a single pile can be increased greatly through post pressure grouting from pile sides and bottom.
通过对柱侧和桩底后压浆,可大幅度提高钻孔灌注桩单桩承载力。
3.
The pile bottom post pressure grouting technology could raise a bored pile s bearing capacity by grouting cement to the end of the pile According to the construction experience ,the working mechanism of pile end grouting appeared to be seep in grouting mainly,and the bearing capacity was composed of the friction of pile side,the resistance and friction of the consolidated bod
介绍了桩底后压浆技术,通过向桩底进行注浆可消除孔底沉渣的不利影响,并提高单桩承载力;通过工程实例分析表明,在卵石层中其灌浆机理主要表现为渗透灌浆,其承载力由3部分组成,即桩身部分的摩擦力、固结体部分的摩擦力和固结体的底部阻力。
6)  postgrouting
后压浆
1.
The vertical bearing capacity of two postgrouting bored piles are calculated base on the formula of criterion,, the contrast between the static load testing results and calculate results, the vertical bearing capacity of postgrouting bored piles are boost, a new method of bearing capacity of piles is also discussed base on 135 the static load testing results.
依据规范公式对2个工程实例后压浆钻孔灌注桩的承载力进行了计算,并和静栽试验结果进行了 比较,表明后压浆钻孔灌注桩的承载力有很大的提高,还在对135根静载试桩分析的基础上提出了新的极限承 载力计算公式。
2.
Based on the statistical data from the static load tests for 186 piles in 72 construction sites, the rein- forcement mechanism of bored piles by postgrouting at pile end and pile lateral is analyzed, and the characteristics of vertical bearing capacity of postgrouting bored pile are studied.
基于72个工地186根静载试桩的统计资料,分析了桩端、桩侧压浆对钻孔灌注桩的增强加固机理,深入研究了后压浆钻孔灌注桩单桩竖向承载力特性。
3.
In order to solve the problem that the residue of the pile bottom has the influence on the bearing capacity of pile foundation in the construction of slurry bored piles, the proper parameters of postgrouting for slurry bored piles in the geological conditions of I class area in Wuhan Changjiang River are discussed.
针对钻孔灌注桩施工中桩底沉渣影响桩基承载力的问题 ,探求在武汉长江Ⅰ级阶地特殊地质条件下灌注桩后压浆技术的合适工艺参数 ,并进行了压浆和非压浆桩的静荷载对比试验 ,在提高承载能力和控制沉降方面取得了较好效果 ,为该地区灌注桩后压浆技术的应用取得了实证资料 。
补充资料:纸板生产最佳方案--浮动式碎压辊在浆机构的应用
四 浮动式碎压辊在涂胶机上浆机构的应用

   涂胶机在整条瓦楞纸板生产线上起着承上启下的作用,上胶量是否均匀,胶线位置是否正确,楞形是否被压扁、变形,都直接影响生产线的效率和纸板的质量。

   传统的涂胶机上浆机构主要是压纸辊式,在以往生产线速度低、产量少、纸板质量要求不高的情况下,它以结构简单,运行稳定,制造成本较低等特点,被广泛地应用于中、低速瓦楞纸板生产线上。但是,在生产过程中,却存在以下缺陷。
 

●需要不断调整上浆辊与压力辊的间隙

   由于纸张克重或楞型的改变,为减少瓦楞被压扁变形,压纸辊和上浆辊的间隙需要较长时间调整。制约了整条生产线的生产速度,降低了生产效率。

●造成纸板变形

   压纸辊和上浆辊的间隙必须小于单面瓦楞纸的自由高度(约为其90%)才能保证瓦楞纸正常上浆,因此,瓦楞在上浆过程中不可避免地被压扁及变形,使上浆面积增大,浆层变厚,影响了粘合后烘干速度,纸板的强度相刘`较低,而且是造成纸板露坑、倒楞、弯曲等不良现象的主要原因之一。

●无法补偿压纸辊和上浆辊的间隙

   压纸辊和上浆辊由于加工和装配误差,会出现一些不规则的径向跳动,另外,工作过程辊表面不同程度的磨损,都会使两条辊的间隙不能保持均匀,而压纸辊和上浆辊都是刚性连接,因此无法补偿以上缺陷,严重时会使纸板粘合不良,造成脱胶、起泡、边压强度降低等缺陷,也缩短了上浆辊的使用寿命,增加了维护成本和时
间,影响生产。

   近年,针对压纸辊式上浆机构的缺陷,制造商生产出浮动压板式上浆机构,其原理是用多片浮动弧形压板取代了压纸辊。通过铰链和弹簧的作用,使纸板均匀地贴合在上浆辊上,并自动补偿压板和上浆辊的间隙,提高了生产效率,延长了上浆辊的使用寿命。但是,由于瓦楞纸与压板是面接触,其滑动摩擦力远大于压纸辊式上浆机构的滚动摩擦,瓦楞与上浆辊也由原来的单瓦楞接触变成多楞接触,由于上浆辊的线速度比瓦楞纸的走纸速度慢10%左右,瓦楞纸需要在上浆辊表面滑行一小段距离,这些因素增加了走纸的阻力,高速运行时容易把纸拉断。同时,压板因出现故障不能正常压纸时,因为位置变化不大,较难被发觉,容易造成大量的不良品。

   为适应当今瓦楞纸板低克重、高强度,生产线高速、高效的要求,近期,制造商研发了新一代碎压辊式上浆机构,通过十多个用滑套和弹簧支承的短浮动滚筒,使瓦楞纸均匀地贴合在上浆辊表面,其浮动性保证了瓦楞纸与上浆辊的接触质量不受浆辊的局部磨损和瓦楞高度变化影响,压力均匀,浮动滚筒还克服了压板由于滑动摩擦力大较易断纸的问题,滚筒的转动也使其在出现故障时容易被发现,减少了不良品的出现。

   浮动式碎压辊上浆机构较好在结合了压纸辊式和浮动压板的优点,又克服他们各自的缺陷,提高了胶机的质量和效率,为优质、高效瓦楞纸板生产线的应用提供了必要的技术条件。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条