1) interface normal tensile stress
层间法向拉应力
1.
The 3D finite element method was used to study the critical stress position,the overlay tensile stress,interface shear stress and interface normal tensile stress.
采用有限元方法进行三维空间实体建模,分析了铺装层受力最不利位置、铺装层拉应力、层间剪应力和层间法向拉应力。
2) Interface normal pulling stress
层间法向拉拔力
3) hoop interlaminar shearing stresses
环向层间剪应力
1.
Analysis results show that asymmetry plies increase the hoop interlaminar shearing stresses by 0.
表明铺层的不对称性会显著导致环向层间剪应力增大,增幅在0。
4) axial interlaminar shearing stresses
轴向层间剪应力
1.
The ratio of axial plies to hoop plies plays an important role on the hoop and axial interlaminar shearing stresses, which the stresses reach to a.
14倍,但对轴向层间剪应力影响很小;碳/环氧管的轴向铺层和环向铺层的比例对轴向层间剪应力和环向层间剪应力有显著影响,其比例在7∶3~4∶1时可以有效降低碳/环氧管的层间应力。
5) normal tension
法向拉力
6) conversion angle of normal tensile and compressive stress
法向拉压应力转换角
补充资料:上向分层充填采矿法
上向分层充填采矿法
cut-and-fill sloping
shongxlang feneeng ehongtlan eolkuangfa上向分层充填采矿法(eut一and一fill、toping) 在采矿中,按分层上向回采矿房、矿块或盘区,每个分层先采出矿石,然后对回采后一分层所需工作空间以外的采空区进行充填的充填采矿法。这种采矿法的工作空间位于矿石顶板下,适用于开采矿石稳固、围岩中等稳固、急倾斜和倾斜的各种厚度和形状的矿体。 分类按分层的倾角,上向分层充填采矿法分为上向水平分层充填采矿法和上向倾斜分层充填采矿法。在上向倾斜分层充填采矿法中利用重力沿充填体的倾斜表面运搬落下矿石和充填材料。这种采矿法已随机械化程度的提高而很少使用。按采场与矿体走向的关系,上向分层充填采矿法可分为沿矿体走向的和垂直矿体走向的两种。按开采单元的大小,上向分层充填采矿法可分为矿块上向分层充填采矿法和盘区上向分层充填采矿法。当使用自行采掘设备和料坡道,并且矿房和间柱都垂直矿体走向布置时,常采用盘区上向分层充填采矿法。一条斜坡道为一个盘区服务。一个盘区包括数个矿房和间柱。按采场中有无点柱,上向分层充填采矿法又可分为有点柱的和无点柱的两种。点柱是直径或边长为5一sm的圆形或方形矿柱,用于支撑工作空间顶板。一般可用点柱代替间柱,不再回采点柱。 结构参数采用沿走向上向分层充填采矿法(见图),使用电耙运搬矿石时,矿房长为15一50m;使用铲运机运搬矿石时,矿房长为10。一30Om,最长可达soom,矿柱长度等于4一15m,矿房和矿柱宽度都等于矿体宽度,但小于15或Zom。间柱在第二个步骤回收或不回收。采用矿块式或盘区式垂直走向上向分层充填采矿法时,矿房和间柱长度都等于矿体宽度,且大于10或15m。矿房宽度为8一12m,间柱宽度为5一sm。矿房和间柱分两个步骤回收。采用点柱上向分层充填采矿法时,点柱间的跨度为10~15m。常在矿石品位低或夹石多的地点留点柱。点柱中矿石不回收。间柱中的矿石也常常不回收。对于各种类型的上向分层充填采矿法,阶段高度为40~IOOm。顶柱厚为4一sm,底柱高度为sm左右,有时用人工底柱代替底柱,并且不留顶柱。沿走向上向分层充填采矿法见图。 采准留底柱时,若采用沿走向上向分层充填采矿法,则从沿脉运输巷道向矿房或间柱掘进溜矿井、人行通风脱水天井和充填、通风、人行天井;若采用垂直走向上向分层充填采矿法,则从穿脉运输巷道掘进上述天井,在底柱上部掘进拉底巷道。溜矿井和人行通风脱水天井只掘进到拉底水平。不留底柱时直接在运输水平掘进拉底巷道。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条