1) key staff
关键员工
1.
Investigation on the model of key staff s stimulation;
企业关键员工激励模型的探讨
2.
The connotation of key staff, human-oriented management and enterprise s core competitiveness are expounded, the relation between the key staff based human-oriented management and enterprise s core competitiveness is revealed.
阐述了关键员工、人本化管理及企业核心竞争力的内涵,揭示了关键员工的人本化管理与提升企业核心竞争力的关系,通过介绍陕西省电力公司以关键员工的人本化管理提升企业核心竞争力的实践,说明人本化管理理念及管理模式是培育和提升企业核心竞争力的基础和保证。
2) Key employees
关键职员
3) key staff discern models
关键员工识别模型
4) key technology
工艺关键
1.
The processing and key technology in GAIM,as well as its advantages and application areas are introduced.
介绍气体辅助注射成型工艺、工艺关键、优点、应用范围。
5) key process
关键工序
1.
The paper introduced the technological study for PB reactor key process, relating the key process adopted technology and quality control measures, and technological study of important product key process is very important.
本文介绍了PB反应器关键工序的工艺方案研究 ,详细论述了关键工序应采取的工艺技术和过程质量控制措施 ,阐述了重要产品关键工序工艺方案研究的重要
2.
Briefly analyses the quality control on raw material, welding and other key processes, emphasizes the importance of check items detailed.
本文主要介绍了电站锅炉检查重点,对原材料、焊接、无损检验等关键工序的质量问题进行了简要分析,强调了检验项目细化的必要性。
3.
Qualified and fine projects can only be achieved through the following:working out programme of process control;identifying special course and key process ;providing personnel, tools, equipments and materials which can en-sure construction process achieved ssetting up process method; working according to document for control;making various of records.
编制过程控制程序,确定“特殊过程”、关键工序,配备保证过程能力的人员、机具、设备、材料,规定工艺方法,并严格按控制文件执行,作好各种记录,才会筑造出合格、优良的工程。
6) key procedure
关键工序
1.
This article interprets the calculation of 256 m half-through concrete-filled steel tube arch, and the construction process and key procedure.
介绍了青干河大桥设计研究有关情况,并对主跨256m中承式钢管混凝土拱的计算研究作了说明,从设计研究的角度对该工程关键工序及施工方案进行了阐述。
2.
Combined with the seawater desalination project of Hebei Datang Wangtan power plant,it introduces the construction arrangement,main construction plans and debugging plans of the key procedures in electrical system and seawater desalination control system,which is a guidance for the future construction of this field.
通过河北大唐王滩电厂海水淡化工程,介绍了电气系统及海水淡化控制系统关键工序的施工安排、主要的施工方案及调试方案,对于今后同行业的施工具有重要的指导意义。
补充资料:非免付加班费员工
非免付加班费员工:指根据公平劳动法要求必须对其超时工作支付加班费的雇员。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条