1) underground power station
地下电站
1.
Key concrete construction technology of TGP s underground power station on left bank;
三峡左岸地下电站混凝土施工关键技术
2.
Analysis on tailrace system with varying crown elevation of TGP s right bank underground power station;
三峡右岸地下电站变顶高尾水系统分析研究
3.
7 auxiliary transformer of Jingpohu Hydropower Plant underground power station in cave entrance is act as important power supply of network controlled switching station.
镜泊湖发电厂地下电站洞口#7厂用变压器作为网控开关站的重要电源,其接线方式的合理性和科学性至关重要,关系到镜泊湖地下电站的安全稳定运行。
2) underground hydropower station
地下电站
1.
Analysis on influence of flow velocity-flow regime and sedimentation on operation of underground hydropower station of Three Gorges Project;
三峡工程地下电站前流速流态和泥沙淤积对电站运行的影响分析
2.
Its underground hydropower station is located in the layered rocks in soft and hard rocks check.
水布垭工程地处灰岩狭谷河段,大坝高233 m,为目前世界上最高的面板堆石坝;地下电站位于软硬相间的层状岩体中;溢洪道最大泄洪功率3。
3.
The main powerhouse of Three Gorges underground hydropower station is with large span and thin cover, and it is rare internationally.
三峡地下电站主厂房跨度大、覆盖薄,国内外少有。
3) underground power plant
地下电站
1.
Hydrodynamic characteristics of changing top-altitude tailrace tunnel for Three Gorges Project s underground power plant;
三峡地下电站变顶高尾水洞水动力特性
2.
Before the excavation of diversion tunnel of the right-bank underground power plant of the Three Gorges Project,the reservoir has started its initial impoundment.
三峡右岸地下电站引水隧洞开挖前,水库已进行初期蓄水,预建段积水排放是进行引水隧洞上平段开挖贯通的前提,保证积水引排经济合理,对工程施工具有极其重要的意义。
4) underground substation
地下变电站
1.
Analysis on present construction situations of underground substation;
地下变电站建设现状分析
2.
Operational problems for large underground substations and relevant countermeasures;
大型地下变电站运行问题分析及对策措施
3.
Application of uplift piles with hole expansion end to anti-floating design for underground substations;
带扩孔端的抗拔桩在地下变电站抗浮设计中的应用
5) underground hydropower station
地下水电站
6) underground nuclear power plant
地下核电站
补充资料:黄河上最大的电站——龙羊峡电站
黄河上最大的电站——龙羊峡电站
黄河上最大的电站——龙羊峡电站 贺建福撮
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条