1) underground diesel engine room
地下柴油电站
1.
The cooling and ventilation of an underground diesel engine room was simulated by Airpak software.
本文使用Airpak对地下柴油电站通风降温进行CFD模拟,找出传统送风方式下电站内空气温度分布,得到了在不同送风方式下空气温度的区别,认为两侧变送风口的送风方式和3 m/s的送风速度能达到更好的效果。
2) diesel engine power station
柴油电站
1.
This paper proposes that it is necessary to replace the diesel engine power station by adopting PEMFC generators to constitute a non-smoking, non-camouflage, clean and high-efficient mothball power source in the existing underground engineering.
本文提出在现有地下工程中,采用PEMFC发电机取代柴油电站,构成一个没有排烟、不需伪装的清洁高效电源作为备用电源势在必行。
3) diesel power station
柴油发电站
1.
Design of ventilating and cooling system for diesel power station in civil air defenses;
人防柴油发电站通风冷却系统设计
4) underground hydropower station
地下电站
1.
Analysis on influence of flow velocity-flow regime and sedimentation on operation of underground hydropower station of Three Gorges Project;
三峡工程地下电站前流速流态和泥沙淤积对电站运行的影响分析
2.
Its underground hydropower station is located in the layered rocks in soft and hard rocks check.
水布垭工程地处灰岩狭谷河段,大坝高233 m,为目前世界上最高的面板堆石坝;地下电站位于软硬相间的层状岩体中;溢洪道最大泄洪功率3。
3.
The main powerhouse of Three Gorges underground hydropower station is with large span and thin cover, and it is rare internationally.
三峡地下电站主厂房跨度大、覆盖薄,国内外少有。
5) underground power station
地下电站
1.
Key concrete construction technology of TGP s underground power station on left bank;
三峡左岸地下电站混凝土施工关键技术
2.
Analysis on tailrace system with varying crown elevation of TGP s right bank underground power station;
三峡右岸地下电站变顶高尾水系统分析研究
3.
7 auxiliary transformer of Jingpohu Hydropower Plant underground power station in cave entrance is act as important power supply of network controlled switching station.
镜泊湖发电厂地下电站洞口#7厂用变压器作为网控开关站的重要电源,其接线方式的合理性和科学性至关重要,关系到镜泊湖地下电站的安全稳定运行。
6) underground power plant
地下电站
1.
Hydrodynamic characteristics of changing top-altitude tailrace tunnel for Three Gorges Project s underground power plant;
三峡地下电站变顶高尾水洞水动力特性
2.
Before the excavation of diversion tunnel of the right-bank underground power plant of the Three Gorges Project,the reservoir has started its initial impoundment.
三峡右岸地下电站引水隧洞开挖前,水库已进行初期蓄水,预建段积水排放是进行引水隧洞上平段开挖贯通的前提,保证积水引排经济合理,对工程施工具有极其重要的意义。
补充资料:地下
1.地面以下;地层内部。 2.谓政党﹑团体等处于非法﹑秘密活动状态。 3.指阴间。 4.地面上。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条