2) Wanjiazhai YRDP
万家寨引黄工程
1.
Summarization on the Characteristics of Water Supply Pumps in Wanjiazhai YRDP (Yellow River Diversion Project);
山西万家寨引黄工程供水泵组特点综述
2.
Comparison and Selection of the Construction Schemes for the Outlet Section of No.1 Tunnel in the Northern Main Line of Wanjiazhai YRDP(Yellow River Diversion Project);
万家寨引黄工程北干线1号隧洞出口段施工方案比选
3.
The Application of GIS (Geographic Information System) in the Construction and Management of Wanjiazhai YRDP (Yellow River Diversion Project);
地理信息系统在万家寨引黄工程建设和管理中的应用
3) Wanjiazhai Yellow River Diversion Project
万家寨引黄工程
1.
Analysis and prediction on water quality and its trend within areas supplied by Wanjiazhai Yellow River Diversion Project;
万家寨引黄工程供水区水质分析及趋势预测
2.
Excavation Construction of Underground Pump Station No.1 and No.2 in Wanjiazhai Yellow River Diversion Project;
万家寨引黄工程总干线一、二级地下泵站开挖施工
3.
Population patterns of dominants of plant communities alongside Wanjiazhai Yellow River Diversion Project,Shanxi;
万家寨引黄工程沿线植物群落优势种群分布格局研究
4) YRDP
万家寨引黄工程
1.
On the basis of analyzing the current situation of groundwater development and utilization in Taiyuan water supply area of Wanjiazhai YRDP(Yellow River Diversio Project), a series of environmental hydrogeologic problems caused by over-exploitation of the groundwater are revealed.
在分析万家寨引黄工程太原供水区地下水开发利用现状的基础上,指出地下水超采引起的环境水文地质问题有:泉水断流;区域地下水水位下降并形成大面积降落漏斗,含水层疏干或产水量减少;由于地下水水位下降,导致地下水水质污染加重及地面沉降。
2.
1in the South Main Line of YRDP and the structure de-sign of its inlet pressure pipes.
介绍了万家寨引黄工程南干线一级泵站工程地质情况和其进水压力管道的结构设计。
5) the Wanjiazhai Diversion Project
万家寨引黄入晋工程
1.
Calculating design flood for the Wanjiazhai Diversion Project;
万家寨引黄入晋工程设计洪水计算
补充资料:万家飘香
【材料】:
a料:香菇头3两
蛋4粒
糖
味素
盐
香油
胡椒粉
辣椒粉
b料:蛋2粒
味素少许
盐少许
糖少许
全脂奶粉1汤匙
【作法】:
1.香菇头泡软洗净,水挤乾压扁二次,加材料a拌匀备用。
2.锅热倒入三匙油,加作法1炒香置凉后再加料b拌仁再用胶膜包成片
形蒸40分钟备用。
3.锅热倒入适量油用中温油炸成金黄色即可。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条