1) first-stage construction of YRDP
引黄一期工程
1.
This paper introduces the general situation of YRDP, and from the examination and approval of the general estimate of the construction investment to the investment control of each stage of the construction, expounds in detail the investment management of the first-stage construction of YRDP, which provides experiments for the large-scale engineering s funds management.
介绍了引黄一期工程概况,从工程投资概算的审批到工程建设各阶段的投资控制,对引黄一期工程的投资管理进行了详细叙述,为大型工程的资金管理提供了经验。
4) YRDP
引黄工程
1.
Evaluation on Hydrogeological Condition and Engineering Geological Condition of Jiabao Section in Wanjiazhai Yellow River Diversion Project (YRDP);
万家寨引黄工程贾堡水文地质与工程地质条件评价
2.
The Technical Transformation Scheme of the Water-supply System Auto-Controlled PLC of SM1/SM2 Pump Station in YRDP(Yellow River Diversion Project) and Implementing Effect;
引黄工程SM1/SM2泵站供水系统自控PLC技改方案及实施效果
3.
The Operation of the Water-transmission Line in the Linkage Section of YRDP(Yellow River Diversion Project);
山西省万家寨引黄工程连接段输水管道系统运行
5) Yellow River Diversion Project
引黄工程
1.
Stress Analysis for Reinforced Concrete Bifurcated Pipes in the Yellow River Diversion Project;
引黄工程钢筋混凝土岔管应力分析
2.
Safety Monitoring of Underground Pumping Station and Real Osmotic Pressure of Out-water Wells of the Yellow River Diversion Project;
引黄工程地下泵站安全监测及出水竖井的实际渗透压力
3.
Safety Monitoring Design of Wanjiazhai Yellow River Diversion Project;
山西省万家寨引黄工程安全监测设计
6) Tao River Water Diversion/Transfer Project Ⅰ
引洮供水一期工程
1.
An attempt to use 35kV box-type transformer substation for construction power supply of Tao River Water Diversion/Transfer Project Ⅰ
引洮供水一期工程施工供电采用35kV箱式变电站的尝试
补充资料:万家寨引黄入晋工程
中国最大的引水工程。由万家寨水利枢纽和引黄入晋两部分工程组成。前者建于山西和内蒙古交界处的黄河干流上,水库库容89亿立方米,电站装机容量102万千瓦,以供水为主,兼具发电、防洪、防凌功能。后者包括总干渠、北干渠和南干渠(连接汾河),总长315千米,分别引水至大同、朔州和太原。1993年开工建设。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条