1) Wanjiazhai dam
万家寨大坝
1.
Seepage treatment in the gallery at the El.888.8m in Wanjiazhai dam;
万家寨大坝888.8m高程廊道的渗漏处理
2.
Temperature control and preventing cracks in concrete of Wanjiazhai dam;
万家寨大坝混凝土施工期温控与防裂
2) Wanjiazhai
万家寨
1.
Experiment Analysis on Preventing Ice Run of New Adding No.2 Route Yellow River Bridge in the Upstream of Wanjiazhai Reservoir;
万家寨水库上游新增二线黄河大桥防凌试验分析
2.
Thinking about the Flood Season Control of Wanjiazhai Reservior;
万家寨水库汛期调度的思考
3.
The discharge and inject level hole on the shoulder of dam of Wanjiazhai water project on Yellow River was dug. excavation section was surveyed and benefit was analyzed.;
黄河万家寨水利枢纽工程左右岸坝肩排水灌浆平硐开挖断面测量及效益分析
3) Wanjiazhai Reservoir
万家寨水库
1.
Study on water taking from Wanjiazhai Reservoir and storage capacity of North Trunk Line of Yellow River Delivery Project;
万家寨水库取水和引黄工程北干线水量调蓄研究
2.
The Dispatch of Wanjiazhai Reservoir and Its Main Contradiction;
万家寨水库调度及其主要矛盾
3.
Recharge of the Wanjiazhai Reservoir to karst groundwater;
万家寨水库对库区岩溶地下水的补给作用
4) wanjiazhai water power plant
万家寨电厂
5) the Wanjiazhai Reservoir
万家寨水库
1.
Effect of the Wanjiazhai Reservoir Operation on Ice Prevention Upstream and Downstream;
万家寨水库运用对上下游河段防凌的影响
2.
Evaluation of Researches on Operational Mode of the Wanjiazhai Reservoir on the Yellow River in the Ice-Period;
万家寨水库凌汛期运用方式研究综述
6) over 10 thousand mu basins
万亩大坝
1.
So we used the 3S technology to discover the information of over 10 thousand mu basins and t.
为此,在3S技术的支持下,对贵州省万亩大坝信息进行了提取和验证,取得了客观而又详实的数据,更新了贵州省万亩大坝信息,从而为政府决策和土地资源管理与利用提供了可靠的数据和有利的支持。
补充资料:山西的“生命工程”——万家寨水利枢纽
山西的“生命工程”——万家寨水利枢纽
髓 山西的“生命工程”—万家寨水利枢纽
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条