1) dam area
坝区
1.
In order to study the effect of such uplift on the safety of project, the monitoring system has been set up for a long-term observation in the dam area, dam crest and the gallery at the elevation of 120 m.
为研究抬升的原因及对工程安全的影响,在坝区、坝顶及120m高程廊道内建立了监测系统,进行了较长期的观测,并做了数值模拟计算和室内岩石力学试验,确认大坝可以正常运行。
2) dam region
坝区
1.
Based on analyzing synthetically several representative domestic and international rock mass quality classification systems in dam region,and relying on massive situ-in geological investigation,elastic wave test and rock mechanical situ-in experiments and indoor test,modified Z-system was put forward.
在综合分析国内外几种常用的坝区岩体质量分级体系的基础上,以大量现场地质勘察、弹性波检测和室内外岩石力学试验为依据,提出修正Z系统,并对相关参数的取值作了初步分析。
3) Bakou area
坝口地区
4) Bashang District
坝上地区
1.
Comprehensive evaluation of the eco-resources in Bashang District.;
坝上地区生态资源综合评估
2.
at different altitude in Bashang district,Zhangjiakou,the results show that with the altitude′s rising,the growth of height and rootstock of Pinus sylvestris var.
通过对张家口坝上地区不同海拔高度樟子松苗木生长状况的研究,得出随着海拔高度的升高,樟子松苗木的高生长、根茎生长受到抑制,冻伤冻死几率增加,是制约张家口坝上地区樟子松引种成功与否的一个主导因子。
5) Bashang area
坝上地区
1.
A superficial analysis on sandy desertification problem in Bashang area;
浅析坝上地区土地沙漠化问题
2.
The water requirement,water requirement rate and crop coefficient of alfalfa in Bashang area
坝上地区紫花苜蓿的需水量、需水强度和作物系数(Ⅱ)
3.
Review and Reconsideration of the 100 Years' Development of Bashang Area in Zhangjiakou
张家口坝上地区百年开发的回顾与反思
6) Bashang region
坝上地区
1.
Study on radish plastic film mulching culture and water saving technology in Bashang region in the northwest of Hebei Province;
冀西北坝上地区萝卜地膜覆盖节水栽培技术研究
2.
Effects of water treatment on photosynthetic characteristic of radish under plastic film mulching culture in Bashang Region in the Northwest of Hebei Province;
冀西北坝上地区水分处理对地膜覆盖萝卜光合特性的影响
3.
In this paper, the information of land use/cover change in the Bashang region, Hebei Province during the period of 1987 - 1999, is derived from the TM images in 1987 and 1999 based on the technologies of RS image processing and GIS.
以两期TM遥感图像为数据源,在遥感图像处理和地理信息系统技术的支持下,获取了坝上地区1987-1999年的土地利用/覆盖变化信息。
补充资料:坝区泥沙淤积
坝区泥沙淤积
sedimentation in dam area
boqLJ rl}sho ytljl坝区泥沙淤积(Sedimentation in dam area)河流上筑坝塑水后,由于塑水区内水深加大,流速降低,泥沙沿程淤积,并向坝前推进,造成坝前泥沙的淤积。坝区泥沙淤积产生的问题主要有:①在船闸引航道中及其口门附近产生淤积,使航深不足或水流不顺而有碍通航。②电站进水口前的泥沙堆积使过机水流中的含沙量增大,泥沙变粗,造成过水建筑物或水轮机过流部件的严重磨损。③坝前泥沙淤积有可能影响问门启闭,堵塞泄水孔,影响大坝安全。 以通航为主的枢纽和以发电为主的枢纽对坝区水流条件的要求不同,防治坝区泥沙淤积的措施也不一样。 (1)以通航为主的枢纽。宜将船闸布置在靠近稳定深乱线一侧,要避开弯道的凸岸和回流、缓流区。这些地区都是泥沙集中淤积处,且淤积后又难于冲走。结合各个工程的实际情况,可设置某些导流排沙工程,如修建引航导墙以破除回流减少淤积;设置底部高程较低的冲沙闸,以定期冲刷上游及下游引航道淤沙。 (2)以发电为主的枢纽。高水头水电站的防沙措施主要是设置高程较低的排沙孔。排沙孔布置在机组进水口的下面,防沙效果最好,但结构复杂,施工及管理都不便。一般把排沙孔设在进水口的侧下方,其位置以使进水口处在冲刷漏斗的影响范围之内为原则。低水头枢纽的防沙措施,主要是进行合理的平面布置。如利用弯道环流特性,正面取水,侧面排沙,同时设置导沙坎,常能取得较好的防沙效果。在中小型水库中,也可采取清浑水分治的办法,即在童水区上游修建排浑渠(或排浑洞),当汛期洪水人库时,可将浑水通过排浑渠(洞)直接排往坝下游,减少主库淤积,缓解坝区泥沙问题。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条