1.
Technical specification for construction of centrifugal compressor trains in ethene plants
乙烯装置离心压缩机组施工技术规程
2.
Improvement and Practice of Construction Techniques of Jiangsu Yixing Pumped Storage Power Station
江苏宜兴抽水蓄能电站机组施工工艺的改进与实践
3.
In charge of the technical and quantity surveyor in machining workshop and assembling workshop.
负责机加工车间和组装车间工艺技术施工工作。
4.
Measures to Ensure Foundation Construction Quality for Wind Power Unit;
风力发电机组基础施工质量保障措施探讨
5.
Quality Risk in Foundation Construction of Large-scale Compressor Set and Risk Prevention Measures
大型压缩机组基础施工质量风险和预防措施
6.
Construction,Installation and Commissioning Experiences for 900 MW Units;
900MW机组的施工、安装和调试经验
7.
Research on the Construction Organization of Project Flue Gas Desulfurization of Jinshan Coal-fired Power Plant
金山电厂火电机组烟气脱硫项目施工组织研究
8.
The field management of construction plants is an important component part of management of water resources and hydropower projects.
施工机械现场管理是水利水电工程施工管理的重要组成部分。
9.
Initial analysis on composite disposition of the highway project earthwork construction machine
浅析公路工程土石方施工机械的组合配置
10.
The Selection and Constitute of Mechanical Equipment During the Process of Mechanical Construction;
浅谈机械化施工中机械设备的选择与组合
11.
Application of Combination Construction Method with Rotary Drilling Rig and Rotary Table Rig
旋挖钻机与转盘钻机组合施工法的应用
12.
Study on the Equipment Organization and Evaluation of the Mechanization Construction System;
机械化施工设备组织与评价系统的研究
13.
Construction technique for assebling members of steam turbine house grid-frame with level-slip
汽机房网架散件组装及水平滑移施工技术
14.
1 000 MW ESC Unit Roofing Beam Hoisting Construction
超超临界百万千瓦机组顶板梁吊装施工方案
15.
The type selection and vehicle category of subway shield construction accumulator mining locomotive
地铁盾构施工蓄电池矿用机车选型与车辆编组
16.
1000MW USC Unit Thermal Construction Characters of Guodian Beilun Power Plant
国电北仑1000MW超超临界机组热控施工特点
17.
Discussion on configuration combination of rolling compacted concrete pavement construction machines and tools
浅谈碾压混凝土路面施工机具的配置组合
18.
Embedment of spiral cases of 700MW hydro-generator set Three Gorges Hydropower Plant(Ⅲ-phase)
三峡三期水电厂700MW机组蜗壳埋设施工技术