1.
Modeling of 170MW Unit Governor System of Huanglongtan Hydropower Plant
黄龙滩水电厂170MW机组调速系统建模
2.
Flood Prevention Dispatching Decision Support System in Huang Longtan Hydro Power Station
黄龙滩电厂防洪调度决策支持系统
3.
Optimization of Protection Configuration for 10kV Station Transformers of Longtan Hydropower Station
龙滩水电站10kV厂用变保护的优化配置
4.
Modification of Technical Water Supply Forward(Backward) Control System for Units of Longtan Hydropower Station
龙滩水电厂机组技术供水正(反)向控制系统改造
5.
Test and Research on Exceptional Noise of #1 Generator in Bailongtan Hydropower Plant;
百龙滩水电厂#1发电机组异音测试研究
6.
Constructing International First-class Hydropower Plant with the Characteristics of Longtan management;
构建具有龙滩管理特色的国际一流水力发电厂
7.
Ventilation Design for Structures at Underground Power House Caverns of Longtan Hydropower Station
龙滩水电站地下厂房洞室群建筑通风设计
8.
Analysis on reform of transformer protection of 10 kV service power of Longtan Hydropower Plant
龙滩电厂厂用10kV变压器保护改造分析
9.
Mechanical Ventilation (Air Conditioning) Model Experiment of Longtan Hydropower Station s Underground Houses;
龙滩地下水电站全厂机械通风(空调)模型试验研究
10.
Ventilation Model Experiment and Research of Air Current Properties of Longtan Hydropower Station s Underground Houses;
龙滩地下水电站全厂通风模型试验与气流流动特性研究
11.
The stability of high side slope in underground powerhouse intake is an important techniqchal problem that should be resolved during construction of Longtan hydropower station.
地下厂房进水口高边坡稳定是龙滩水电站建设必须解决的重大工程技术问题。
12.
The precipitation bailing planning of circulation water system construction of Wangtan electric power plant
王滩电厂循环水系统施工降排水方案
13.
Optimal coagulant dosage test for Longtan Nafubao Water Plant
龙滩纳付堡水厂最佳混凝剂投用量试验
14.
Estimation of Adit Dirt Volume in Longtan Hydropower Station Dam Area
龙滩水电站坝址区平洞结垢量的估算
15.
Financing for the Longtan Hydropower Project and its funds management;
龙滩水电站工程融资和资金使用管理
16.
Protection Measures for Main Transformer in Yantan Hydropower Station
岩滩水力发电厂主变压器的防护处理
17.
Discussion on Favoring the People of Relocation by Aquatic Breeding in Luodian Reservoir of Longtan Hydropower Station;
龙滩水电站罗甸库区水产养殖反哺移民的探讨
18.
RCC Engineering Technique Applied to Intake Section of Longtan Hydropower Station
龙滩水电站进水口坝段碾压混凝土施工技术