1) cantilever erection construction
悬臂拼装施工
1.
For the long span prestressed concrete continuous bridge adopting cantilever erection construction method,it was important to make sure the quality and security of segment No.
采用悬臂拼装施工的大跨度预应力混凝土连续梁桥,因0号块梁段的构造和受力较为复杂,保证它的质量与安全非常重要。
2) cantilever assembly
悬臂拼装
1.
In this paper,construction technologies of cantilever assembly are discussed.
全面论述了悬臂拼装的施工技术措施,重点阐述了浮吊吊装0~2号块、桥面吊机吊装其它梁节以及合龙施工技术,介绍了桥面吊机工作原理、临时预应力施加及悬拼过程监控等重点措施的施工技术。
3) cantilever erection
悬臂拼装
1.
Research on Method of Geometry Control during Cantilever Erection of PC Cable-Stayed Bridges;
预应力混凝土斜拉桥悬臂拼装施工线型控制方法研究
2.
In the segment precasting,cantilever erection and bridge deck construction during the PAKSEY bridge construction, the precise surveying control results in the minimum error between the bridge deck line and the designed line.
在PAKSEY大桥的施工过程中,对节段梁的预制、节段梁的悬臂拼装以及桥面体系的施工进行了精密的测量控制,从而使桥面线形与设计线形的误差最小。
4) Precast segmental cantilever method
悬臂拼装
1.
This paper emphasizes on the construction control of concrete arch bridge, which is constructed by the precast segmental cantilever method.
本文以悬臂拼装钢筋混凝土拱桥的施工控制为研究对象,结合工程实例,分析了大跨径钢筋混凝土拱桥的悬臂拼装施工方法,认为施工过程中拉索的索力直接影响拱肋截面的应力和拱肋轴线的标高,拱肋截面的应力是悬臂拼装拱桥施工控制的关键因素。
6) cantilever erection method
悬臂拼装法
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条