1) high-above-ground construction
悬臂梁施工
2) cantilever constructing bridge
悬臂施工桥梁
1.
The principle and method that fold counterpoise applied of cantilever constructing bridge;
悬臂施工桥梁合拢配重施加的原理和方法
5) cantilever construction
悬臂施工
1.
Effect of temperature on the elevation of main girders during the cantilever construction of long-span bridges;
大跨度桥梁悬臂施工过程中温度对主梁标高的影响分析
2.
Cast-in-site cantilever construction control of a continuous box girder bridge;
连续箱梁桥现浇悬臂施工控制技术
3.
Linear control in cantilever construction of prestressed concrete continuous rigid-framed bridge;
预应力混凝土连续刚构桥悬臂施工线形控制
6) cantilever casting construction
悬臂施工
1.
Using free cantilever casting construction method to build, this bridge is one of the longer span PC continuous rigid frame bridges in china.
该桥集高墩、大跨及窄桥面于一体,施工要求高、技术难度大,因此有必要对悬臂施工线形控制和应力监控进行系统总结,以便为同类桥梁的设计与施工积累建设经验。
补充资料:悬臂梁冲击强度
分子式:
CAS号:
性质:用悬臂梁形式测定的受试材料冲击强度。试验时将规定尺寸的试样一端夹在试样夹具上,然后释放一个摆锤对试样施加冲击负荷使试样破断。记录其吸收的能量而算得结果。试样可以有缺口,也可以无缺口。其结果分别称悬臂梁缺口冲击强度或悬臂梁无缺口冲击强度。试验中的有关条件都在标准试验方法中有明确规定,单位为kJ/m2。由于该试验方法中被打断的试样飞出带走的一部分能量(称飞出功)无法精确计算,因此不能获得材料破断的确切能量数据,但由于操作简便,故仍被广泛使用。特别是对用简支梁冲击得不到结果的材料,可使用悬臂梁冲击方法。
CAS号:
性质:用悬臂梁形式测定的受试材料冲击强度。试验时将规定尺寸的试样一端夹在试样夹具上,然后释放一个摆锤对试样施加冲击负荷使试样破断。记录其吸收的能量而算得结果。试样可以有缺口,也可以无缺口。其结果分别称悬臂梁缺口冲击强度或悬臂梁无缺口冲击强度。试验中的有关条件都在标准试验方法中有明确规定,单位为kJ/m2。由于该试验方法中被打断的试样飞出带走的一部分能量(称飞出功)无法精确计算,因此不能获得材料破断的确切能量数据,但由于操作简便,故仍被广泛使用。特别是对用简支梁冲击得不到结果的材料,可使用悬臂梁冲击方法。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条