说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 洪水坦化
1)  flood calming
洪水坦化
2)  flood change
洪水变化
1.
The paper has analyzed on the grain size,total organic carbon(TOC) content,Hg and CaCO_(3) content of 105 samples from Weihe river deposits in Xi an suburb,and hereby has studied the flood changes indicated by the deposit sequence over the past 120 years based on the chronology data recorded by historical books.
根据高陵渭河河漫滩沉积剖面中105个样品的颗粒与有机质分析,Hg与CaCO3含量测定和史书记载的年代资料,研究了西安高陵渭河距今约120a来河漫滩沉积指示的洪水变化。
2.
Recent flood changes of Weihe River in Xianyang;
根据咸阳渭河河漫滩沉积野外调查和40个样品的颗粒分析资料,研究了咸阳渭河距今约100年以来洪水深度、洪水变化阶段和气候变化。
3)  flood resources utilization
洪水资源化
1.
Study on flood resources utilization by Zipingpu key water-control project;
紫坪铺水利枢纽洪水资源化研究
2.
Under the condition of arid and flood coexistence and the water resources shortage,the flood resources utilization has became more and more important.
在现代治水理念从过去单一控制洪水向全面管理洪水转变的基础上,提出洪水资源化。
3.
This paper demonstrated theoretical base of flood resources utilization,and explained the conception of flood resources utilization in detail.
洪水资源化是获得水资源的新途径。
4)  flood resource utilization
洪水资源化
1.
Based on the concept of "flood resource utilization" and influencing factors of adjusting the limited level of reservoirs during the flood season,an indices-evaluating system and estimating method about risk and performance related to the adjustment of limited level was set up,and the risk management countermeasure of the water level adjustment was discussed.
在论述“洪水资源化”概念和调整水库汛限水位所涉及的影响因素的基础上,构建了汛限水位调整后的风险和效益评价指标体系及其估算方法,以及论述了水库汛限水位调整的风险管理对策。
2.
Channeling flood water from rivers to realize flood resource utilization, the water head of inside and outside of channel head is one of keys to flood quantity.
从河流中引蓄洪水实现洪水资源化,引水渠首内外水位差是引蓄洪水水量的关键之一。
3.
Someproblems about flood resource utilization are invest.
与目前洪水资源化的研究多为概念上的论述相比,该部分内容将洪水资源化研究具体到了量化的层面。
5)  floodwater utilization
洪水资源化
1.
Evaluation of potential of floodwater utilization in the middle and lower reaches of the Weihe River;
渭河关中段洪水资源化潜力评估
2.
With the rapid development of social economy and water requirements,water resource shortage problem is deteriorated and the function of reservoir in terms of floodwater utilization becomes more and more important nowadays in China.
洪水资源化具有鲜明的时代特征,其利用矛盾的对立统一性原理,可有效地实现由控制洪水向洪水管理的转变。
3.
In the increasingly serious contradiction between the water resource supply and demand in China, especially in North China, several key factors of floodwater utilization such as necessity and feasibility, theory and technology of reservoir optimization dispatching and risk rate calculation are analyzed.
针对我国尤其是北方地区水资源供需矛盾日益突出的问题,分析了洪水资源化的内涵、洪水资源化的必要性和可能性、水库优化调度理论与技术及风险率计算等洪水资源利用中的关键问题,最后结合我国实际情况,对洪水资源化今后的工作提出合理化建议。
6)  flood resources
洪水资源化
1.
It deems that it can solve not only the issues of depletion,water shortage and sedimentation of the middle and lower Yellow River,but also alleviate the water pollution and environment deterioration by the ways of "flood storage","sediment regulation","washout pollution","bed-building" and "flood diversion" through the study on flood resources implementation of the Yellow River.
通过对实施黄河洪水资源化的研究,认为采取“蓄洪”、“调沙”、“冲污”、“造床”、“引洪”等方式,可以解决黄河中下游的断流及缺水、泥沙淤积等问题,还能缓解黄河水质污染、生态环境恶化等。
2.
Flood resources utilization is an important measure to exert flood resources characteristic,lessen water resources shortage,reduce waterlog and drought losses,and actualize continuable development of water resources.
洪水资源化利用是发挥洪水资源特性,缓解水资源短缺,减少水旱灾害损失,实现水资源可持续开发利用的重要措施。
补充资料:科素亚 ,氯沙坦钾,氯沙坦, 芦沙坦, 洛沙坦
药物名称:洛沙坦

英文名:Losartan

别名: 科素亚 ,氯沙坦钾,氯沙坦, 芦沙坦, 洛沙坦
外文名:Losartan, Cozaar, Novartis
成分: 氯沙坦钾
适应症: 高血压。
用量用法:
通常剂量为50mg,qd,治疗3-6周后达到最大抗高血压效应。在部分病人中,每天剂量可增加到100mg。血容量不足的病人(例如应用大量利尿剂)起始剂量应该为25mg,qd。
禁忌: 儿童,妊娠和哺乳妇女。
不良反应:
轻微而短暂的头晕,剂量相关性体位性低血压。罕见皮疹、荨麻疹,血管神经性水肿(包括面、唇和/或舌肿胀)。腹泻及偏头痛。偶有高血钾,罕见ALT升高。敏感个体和动脉狭窄的病人可出现肾功能异常。
注意事项: 血容量不足的病人应先补充血容量,减少起始剂量。有肝功能损害病人应使用较低剂量。
规格: 片剂 50mg x 7片。


类别:抗高血压药
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条