2) flood resources utilization
洪水资源化
1.
Study on flood resources utilization by Zipingpu key water-control project;
紫坪铺水利枢纽洪水资源化研究
2.
Under the condition of arid and flood coexistence and the water resources shortage,the flood resources utilization has became more and more important.
在现代治水理念从过去单一控制洪水向全面管理洪水转变的基础上,提出洪水资源化。
3.
This paper demonstrated theoretical base of flood resources utilization,and explained the conception of flood resources utilization in detail.
洪水资源化是获得水资源的新途径。
3) flood resource utilization
洪水资源化
1.
Based on the concept of "flood resource utilization" and influencing factors of adjusting the limited level of reservoirs during the flood season,an indices-evaluating system and estimating method about risk and performance related to the adjustment of limited level was set up,and the risk management countermeasure of the water level adjustment was discussed.
在论述“洪水资源化”概念和调整水库汛限水位所涉及的影响因素的基础上,构建了汛限水位调整后的风险和效益评价指标体系及其估算方法,以及论述了水库汛限水位调整的风险管理对策。
2.
Channeling flood water from rivers to realize flood resource utilization, the water head of inside and outside of channel head is one of keys to flood quantity.
从河流中引蓄洪水实现洪水资源化,引水渠首内外水位差是引蓄洪水水量的关键之一。
3.
Someproblems about flood resource utilization are invest.
与目前洪水资源化的研究多为概念上的论述相比,该部分内容将洪水资源化研究具体到了量化的层面。
4) floodwater utilization
洪水资源化
1.
Evaluation of potential of floodwater utilization in the middle and lower reaches of the Weihe River;
渭河关中段洪水资源化潜力评估
2.
With the rapid development of social economy and water requirements,water resource shortage problem is deteriorated and the function of reservoir in terms of floodwater utilization becomes more and more important nowadays in China.
洪水资源化具有鲜明的时代特征,其利用矛盾的对立统一性原理,可有效地实现由控制洪水向洪水管理的转变。
3.
In the increasingly serious contradiction between the water resource supply and demand in China, especially in North China, several key factors of floodwater utilization such as necessity and feasibility, theory and technology of reservoir optimization dispatching and risk rate calculation are analyzed.
针对我国尤其是北方地区水资源供需矛盾日益突出的问题,分析了洪水资源化的内涵、洪水资源化的必要性和可能性、水库优化调度理论与技术及风险率计算等洪水资源利用中的关键问题,最后结合我国实际情况,对洪水资源化今后的工作提出合理化建议。
5) flood resources
洪水资源化
1.
It deems that it can solve not only the issues of depletion,water shortage and sedimentation of the middle and lower Yellow River,but also alleviate the water pollution and environment deterioration by the ways of "flood storage","sediment regulation","washout pollution","bed-building" and "flood diversion" through the study on flood resources implementation of the Yellow River.
通过对实施黄河洪水资源化的研究,认为采取“蓄洪”、“调沙”、“冲污”、“造床”、“引洪”等方式,可以解决黄河中下游的断流及缺水、泥沙淤积等问题,还能缓解黄河水质污染、生态环境恶化等。
2.
Flood resources utilization is an important measure to exert flood resources characteristic,lessen water resources shortage,reduce waterlog and drought losses,and actualize continuable development of water resources.
洪水资源化利用是发挥洪水资源特性,缓解水资源短缺,减少水旱灾害损失,实现水资源可持续开发利用的重要措施。
6) flood water resources utilization
洪水资源化
1.
To solve these two problems overall, flood water resources utilization is put forward in Tianjin.
为了统筹解决这两个问题,提出天津市洪水资源化。
补充资料:洪水调度
洪水调度
flood rearrangement
hongshui diaodu洪水调度(flood rearrangement)运用防洪工程设施,在时间上、空间上重新调节安排江河、湖海的洪水量及其水位。在防洪调度中,应充分考虑防洪工程调度规程的要求,并根据洪水特性及其演变规律和防护区的实际情况,因地因时制宜地拟定合理的调度方案,尽可能达到防护区洪灾总损失最小和工程综合效益最大的目的。 单项防洪工程的调度 堤防工程一般应根据防护对象的重要性和堤防抗洪能力划分等级,分级调度。在运用中,当重要堤防的防护控制点水位(或通过流量)将超过保证水位(或安全泄量)时,可及时采取紧急防洪抢险措施,如临时加高培厚、抢护险段,必要时也可选定影响较小的防护区进行扒口分洪。 分洪闸、分洪道、分(蓄)洪区工程,一般以防洪保护区控制点或分洪闸前的水位(或流量)作为控制条件,并根据水情预报及分洪闸以下河道的安全泄量情况,及时开闸分泄超过安全泄量的洪水入分洪道或分(蓄)洪区。在运用中,要随时根据水情变化增减分洪流量,使分‘蓄)洪工程的分洪能力得到最有效的利用。当分洪水量经分洪道,进入河道下游或其他河流、湖泊、海洋,这时应根据承纳洪水河段的行洪能力控制分泄流量。 水库工程对以拦洪或滞供为主的水库,当入库流量超过相应下游防洪标准的洪峰流量时,应按下游防洪要求进行调度,以提高防护区的安全,直到库水位超过防洪高水位再按大坝防洪调度方式运用,即在泄量不大于入库流量的前提下,尽量敞开泄洪设备泄洪,以确保大坝等主体工程能安全渡汛。防洪水库的调度可分为:①固定下泄量〔一级或多级)方式,在这种情况下,应控制水库下泄量不得大于下游河道的安全泄量;若下游防护区不同防护对象有不同的防洪标准时,可以库水位或入库流量的不同值拟定分级控制下泄量方式。②补偿调度方式,应根据水库下游至防洪控制点区间洪水的大小,决定水库的下泄量,即要求水库泄水与区间来水两者之和不超过防护区河道安全泄量。在具体拟定泄量时,可根据入库洪水及下游区间洪水的洪水预报情况拟定,或根据它们的统计值及调度员经验拟定。③预报预泄方式,系在防洪和兴利结合的水库防洪调度中,在下游防护区洪峰流量未来到之前,根据入库洪水和区间洪水的预报,在确保防护区安全的前提下,提前腾空一部分兴利库容,用以提高水库的防洪能力。 系统防洪工程的联合调度 多种防洪设施的联合调度一般应根据各单项工程的防洪能力和调度方式,以及共同防护区的防洪标准、河道安全泄量等条件,针对不同洪水典型,研究安排各项工程投入次序和控制条件,拟定统一调度方式。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条