说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 矿井采掘计划
1)  mine mining plan
矿井采掘计划
1.
in the study of the development and review of mine mining plan.
介绍了矿井采掘计划编制与检验课题研究的发展过程,主要理论和方法,包括矿井采掘计划编制与检验的采掘平衡理论,预测与优化技术,计算机仿真和CAD 技术,最优控制智能决策支持系统等。
2)  mining plan
采掘计划
1.
Development of coal mining plan system;
矿井采掘计划辅助编制系统的开发
2.
Under the condition that the mining plans have bee n made and aimed at the problems caused by the imbalanee between panel preparatio n and coal winning process in coal mines,the optimal control work of the mining plan is carried out from time viewpoint and by means of netwcrk model.
在采掘计划已经编制的条件下,针对矿井经常出现的采掘失调问题,通过网络模型对采区与水平的各项准备工作进行管理,从时间上对采掘计划进行最优控制,并应用智能技术,建立了知识库,为采掘计划调整提供了决策支
3.
ms method combtoed with mining plan can dynamically renect the situation of preparaion and winnin work.
该方法结合采掘计划可以动态、准确地反映矿井现在及未来的采掘关系。
3)  mining plan
采矿计划
1.
The application of value chain in mining plan;
浅谈价值链在采矿计划中的应用
4)  mining convergence plan
采掘衔接计划
5)  scheduled mining plan
采掘进度计划
6)  Mine production sequencing
采掘生产计划
补充资料:采掘技术计划


采掘技术计划
extraction-development plan of mine

  eol]uej{shu{Ihua采掘技术计划(extraetion一devezopment planof mlne)以采掘(剥)平衡为重点,全面安排矿山采掘(剥)生产的技术文件。采掘技术计划分为年度、季度和月度采掘计划,以年度计划为仁在年度采掘技术汁划中,要根据矿山生产规律和本矿的长远规划、总体设计及生产特点,把矿山生产的各种可变因素有机地组织起来,做到设备合理地布置,采场科学地推进,人员合理地组织,生产工序合理地配合,在保证正规采掘的基础上,确定产量、质量和各项技术经济指标的最佳方案。采掘讨一划是矿山企业生产经营计划的基础,是矿山组织生产的主要依据。 基本内容包括文字说明、表格和图纸三部分。 文字说明对上年度采掘技术计划执行情况进行总结,分析计划完成情况和存在的主要问题,指出本年度采掘技术计划编制的原则、目标、采掘重点和主要措施等。 表格一般有十一种表格:主要产品产量汇总表、地质储量和矿量保有计划表、生产勘探工程计划表、露天矿山采场采剥(掘沟)计划表、露天矿山排土计划表、地F矿山采(出)矿计划表、地下矿山掘进计划表、采出矿石质量计划表、主要技术经济指标计划表、主要设备大中修和技术状况计划表和维持简单再生产工程计划表等。图纸主要图纸包括综合平面采掘计划图和有代表性的剖面图,以及分层平面采掘计划图。其他图纸有露天矿排土布置,地下矿通风系统及风、水、电供应系统和重点工程单体设计图等,各矿山可根据需要列为附图。 计划编制过程编制采掘技术计划要贯彻国家有关方针、政策,并结合矿山实际情况,协调好各种关系。编制工作要按步骤进行。计划要体现既节省人力、物力和财力,又能获得最大经济效益的原则。 计划编制应协调的关系主要包括:(1)当前生产与长远发展的关系当前生产要兼顾长远发展,坚持正规采掘,安排好生产勘探工程,保证完成长远规划中的重点工程,确保生产准备矿量的平衡,为矿山持续正常生产创造条件。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条