您的位置:首页 -> 词典 -> 掘进计划
1)  Development scheduling
掘进计划
2)  scheduled mining plan
采掘进度计划
3)  mining plan
采掘计划
1.
Development of coal mining plan system;
矿井采掘计划辅助编制系统的开发
2.
Under the condition that the mining plans have bee n made and aimed at the problems caused by the imbalanee between panel preparatio n and coal winning process in coal mines,the optimal control work of the mining plan is carried out from time viewpoint and by means of netwcrk model.
在采掘计划已经编制的条件下,针对矿井经常出现的采掘失调问题,通过网络模型对采区与水平的各项准备工作进行管理,从时间上对采掘计划进行最优控制,并应用智能技术,建立了知识库,为采掘计划调整提供了决策支
3.
ms method combtoed with mining plan can dynamically renect the situation of preparaion and winnin work.
该方法结合采掘计划可以动态、准确地反映矿井现在及未来的采掘关系。
4)  mining convergence plan
采掘衔接计划
5)  mine mining plan
矿井采掘计划
1.
in the study of the development and review of mine mining plan.
介绍了矿井采掘计划编制与检验课题研究的发展过程,主要理论和方法,包括矿井采掘计划编制与检验的采掘平衡理论,预测与优化技术,计算机仿真和CAD 技术,最优控制智能决策支持系统等。
6)  Mine production sequencing
采掘生产计划
补充资料:阶段详细进度计划编制


阶段详细进度计划编制


  【阶段详细进度计划编制】以房屋开竣工时间为中心进行安排,其主要内容是:房屋的开工复工、竣工交用、市政公用工程及配套项目的开工、商业服务网点的开业、中小学及幼儿园的开学、公共交通路线的开通、道路修建、现场清理、路灯及电话的安装、植树绿化、基层政权的建立和住宅小区的管理等计划。整个工程的竣工日期应和合同日期相吻合。在计划的实施过程中,要求监理(管理)方要对现场情况进行调查分析,及时发现问题解决问题。目前多数开发公司对现场的管理采用定期召开调度会,通过调度会平衡、协调各方面关系。调度会一般由业主召开,或委托监理单位召开,参加调度会的单位一般包括规划设计单位、施工单位、建设单位、房管部门、市政公用等单位。会议内容应是检查计划执行情况,研究解决工程项目建设中遇到的问题,明确解决问题的措施、期限,落实责任制,以便及时排除建设中遇到的障碍,确保计划的完成。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。