1) Open pit production scheduling
露天采掘计划
2) opencast,openwork
露天采掘
3) Open-pit mining and stripping planning
露天矿采剥计划
4) mining plan
采掘计划
1.
Development of coal mining plan system;
矿井采掘计划辅助编制系统的开发
2.
Under the condition that the mining plans have bee n made and aimed at the problems caused by the imbalanee between panel preparatio n and coal winning process in coal mines,the optimal control work of the mining plan is carried out from time viewpoint and by means of netwcrk model.
在采掘计划已经编制的条件下,针对矿井经常出现的采掘失调问题,通过网络模型对采区与水平的各项准备工作进行管理,从时间上对采掘计划进行最优控制,并应用智能技术,建立了知识库,为采掘计划调整提供了决策支
3.
ms method combtoed with mining plan can dynamically renect the situation of preparaion and winnin work.
该方法结合采掘计划可以动态、准确地反映矿井现在及未来的采掘关系。
5) Opencast excavating equipments
露天采掘设备
补充资料:采掘技术计划
采掘技术计划
extraction-development plan of mine
eol]uej{shu{Ihua采掘技术计划(extraetion一devezopment planof mlne)以采掘(剥)平衡为重点,全面安排矿山采掘(剥)生产的技术文件。采掘技术计划分为年度、季度和月度采掘计划,以年度计划为仁在年度采掘技术汁划中,要根据矿山生产规律和本矿的长远规划、总体设计及生产特点,把矿山生产的各种可变因素有机地组织起来,做到设备合理地布置,采场科学地推进,人员合理地组织,生产工序合理地配合,在保证正规采掘的基础上,确定产量、质量和各项技术经济指标的最佳方案。采掘讨一划是矿山企业生产经营计划的基础,是矿山组织生产的主要依据。 基本内容包括文字说明、表格和图纸三部分。 文字说明对上年度采掘技术计划执行情况进行总结,分析计划完成情况和存在的主要问题,指出本年度采掘技术计划编制的原则、目标、采掘重点和主要措施等。 表格一般有十一种表格:主要产品产量汇总表、地质储量和矿量保有计划表、生产勘探工程计划表、露天矿山采场采剥(掘沟)计划表、露天矿山排土计划表、地F矿山采(出)矿计划表、地下矿山掘进计划表、采出矿石质量计划表、主要技术经济指标计划表、主要设备大中修和技术状况计划表和维持简单再生产工程计划表等。图纸主要图纸包括综合平面采掘计划图和有代表性的剖面图,以及分层平面采掘计划图。其他图纸有露天矿排土布置,地下矿通风系统及风、水、电供应系统和重点工程单体设计图等,各矿山可根据需要列为附图。 计划编制过程编制采掘技术计划要贯彻国家有关方针、政策,并结合矿山实际情况,协调好各种关系。编制工作要按步骤进行。计划要体现既节省人力、物力和财力,又能获得最大经济效益的原则。 计划编制应协调的关系主要包括:(1)当前生产与长远发展的关系当前生产要兼顾长远发展,坚持正规采掘,安排好生产勘探工程,保证完成长远规划中的重点工程,确保生产准备矿量的平衡,为矿山持续正常生产创造条件。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条