1) Operation time
作业时间
1.
The conclusion is that rotary drilling machine's operation time and failure time conform to Weibull Distribution Principle.
系统地研究了齐大山露天铁矿牙轮钻机的作业、故障和待作业时间,计算出了其固有和实际可用度,提出了影响各钻机实际可用度的因素,同时指出牙轮钻机的作业和故障时间服从威布尔(Weibull)分布。
2.
The relationships between operation time and material moving distance for both cases of using hauler and forklift are studied,and hence the material moving efficiencies for both cases at different moving distances are obtained.
利用现场IE方法对物料运输时的运输路线、动作、时间等因素进行标准化模拟分析,研究拖车与铲车上线作业时间与运输距离的关系,从而得出不同运输距离情况下拖车与铲车的运输效率。
2) work time
作业时间
1.
A study of work time in sewing line;
服装缝制车间作业时间研究
2.
Each working procedure work time of various assembly flow line is tested through scientific calculation.
通过测算不同装配流水线上各个工序作业时间,利用聚类分析技术将各流水线按不同作业时间进行聚类,并画出装配时间谱系聚类图。
3) total length of leg,total operating time
总作业时间
4) effective operation time
有效作业时间
5) cycle operation time
作业循环时间
1.
On the basis of cycle operation time on the comprehensive work face,the paper compares the applied ranges of the different cycle operation style,educes the calculation formula of the daily output on the comprehensive work face and lists the calculation results of daily output under the normal condition.
在计算综采工作面作业循环时间的基础上,比较了不同作业循环方式的适用范围,导出了计算综采工作面日产量的公式,列表给出了常规条件下的日产量计算结果。
6) auxiliaryoperation time
辅助作业时间
补充资料:兵棋作业(见想定作业)
兵棋作业(见想定作业)
war gaming exercise
bingqi zuoye兵棋作业(war ga而ng exercise)见想定作业。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条