1) flow-shop problem
流水作业时间表
1.
Considering m-machine flow-shop problem with delays and release times, we use 3-Partition to prove that the F2RD problem is NP-hard in the strong sense, and then we introduce a simple heuristic and prove that the worst-case performance is (m+1)/2.
研究流水作业时间表问题,在具有延迟时间的条件下证明该问题是强NP-困难的。
2) open shop scheduling problem
自由作业时间表
1.
This paper considers the open shop scheduling problems with job priorities and release times.
研究了具有优先权的自由作业时间表问题,在工件具有准备时间的条件下,给出一种新的启发式算法,其最坏性能比不超过2,猜想该算法的紧界是2-2/(m+1),其中m是机器的台数。
3) master work schedule
周期作业时间表
4) work time
作业时间
1.
A study of work time in sewing line;
服装缝制车间作业时间研究
2.
Each working procedure work time of various assembly flow line is tested through scientific calculation.
通过测算不同装配流水线上各个工序作业时间,利用聚类分析技术将各流水线按不同作业时间进行聚类,并画出装配时间谱系聚类图。
5) Operation time
作业时间
1.
The conclusion is that rotary drilling machine's operation time and failure time conform to Weibull Distribution Principle.
系统地研究了齐大山露天铁矿牙轮钻机的作业、故障和待作业时间,计算出了其固有和实际可用度,提出了影响各钻机实际可用度的因素,同时指出牙轮钻机的作业和故障时间服从威布尔(Weibull)分布。
2.
The relationships between operation time and material moving distance for both cases of using hauler and forklift are studied,and hence the material moving efficiencies for both cases at different moving distances are obtained.
利用现场IE方法对物料运输时的运输路线、动作、时间等因素进行标准化模拟分析,研究拖车与铲车上线作业时间与运输距离的关系,从而得出不同运输距离情况下拖车与铲车的运输效率。
6) CPOS (Continuous Production Operation Sheet)
流水作业图表;连续生产作业表
补充资料:流水作业
一种生产组织方式,把整个的加工过程分成若干不同的工序,按照顺序像流水似地不断进行。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条