1) earned value
赢得值
1.
The paraments and evaluation system of earned value theory are proposed and their practical process of implement for cost control management in P3E/C software are analysed.
赢得值作为一种先进的动态控制手段,在项目成本控制过程中具有重要的作用,本文探讨了赢得值理论的基本参数和指标体系,结合P3E/C软件分析了赢得值在成本控制管理中的具体实施过程,通过对项目进度、费用及质量的综合管理,提高了项目控制管理的预见性。
2.
Earned value analysis is an integrated method for general measurement of project progress and cost status and an efficient project monitor and control index,basically it applies currency quantity or resource consumption quantity instead of engineering quantity to measure project progress.
赢得值分析法是一种能全面衡量工程进度、费用状况的整体方法,基本要素是用货币量或资源消耗量代替工程量来测量工程的进度,是一种完整和有效的工程项目监控指标和方法。
3.
On the basis of the theory of earned value,authors discuss and research the development of computer aided cost & schedule control system.
以赢得值原理为基础 ,对计算机辅助建设项目成本 /进度综合控制系统的建立进行探讨研究 ,给出系统工作程序、建立系统模型 ,并对系统建立中的难点如 BCWS、BCWP、ACWP的测定进行分析和给出相应的解决办法。
2) earned value concept
赢得值
1.
Application of earned value concept to the control of construction cost;
赢得值原理在工程项目成本控制中的应用
2.
Application of Earned Value Concept in the Dynamic Control of Construction Cost;
赢得值原理在造价动态控制中的应用
3.
As schedule and cost is managed synthetically in project,earned value concept played an important role in construction project management.
赢得值原理作为工程项目中进度与成本综合管理,对施工项目管理起着不可忽视的作用。
3) gain value method
赢得值法
1.
The authors have first recounted the current situation of the progress, quality and investment control method being used in the reservoir resettlement system in the country, suggested to apply the gain value method to the target.
文中首先叙述了我国水库移民系统重建中的进度、质量和投资控制方法现状;提出将赢得值法运用到水库移民系统重建的目标监控中,并对其具体应用方法进行详细论述,且运用案例进行了实证分析。
4) Earned value
挣值/赢得值
5) earned value management
赢得值管理
1.
The paper analyses the work process of earned value management, whose review index and evaluation means are probed into.
本文分析了赢得值管理的工作流程,探讨了赢得值管理测评指标及测评方法。
6) earned value concept
赢得值原理
1.
Based on the earned value concept, the thoughts for compiling simple program for comprehensive control of person hour/schedule of design were described, thus a simple method was provided for the computer control of the projects under the present condition.
以赢得值原理为基础 ,阐述了设计人工时 /进度综合控制简易程序的编制思路 ,为目前条件下工程项目的计算机控制提供了一个简单的方法。
2.
This srticle makes an essential introduction to apply the general principle of cyberneties in project control, brief leads the method of applying the EVC(Earned Value Concept) to carry out the Project Cost/Schdule multiple control, and makes a comparision with the traditional ways.
本文对控制论的一般性原理应用于工程项目控制作了必要的介绍 ,简要地引入了运用赢得值原理进行项目费用/进度综合控制的方法 ,并对这种方法与传统方法进行了比较。