说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 土方开挖
1)  earth excavation
土方开挖
1.
Foundation pit support and earth excavation of underground garage in a certain residential engineering;
某住宅工程地下车库基坑支护及土方开挖
2.
On earth excavation and support scheme;
浅谈土方开挖及支护方案
3.
Comparisons on economical and optimal plans of earth excavation;
浅谈土方开挖方案经济优化的比较
2)  soil excavation
土方开挖
1.
Considering of the post-pouring concrete strain of the building,the suitable enclosure structure,the technology of curtain for cutting off water,soil excavation method was chosen and strengthening the construction monitoring to induced the harmful influence to the surroundings around the pit.
深基坑工程长近百米,周边环境复杂,施工作业条件差,结合工程设计留设的后浇带,采用适合的支护结构体系、止水帷幕技术、土方开挖方法,加强施工监测,着力于减少对周边环境的不利影响,为类似条件的深基坑工程的施工提供了有益的经验。
2.
Engineers made rational construction plans such as soil excavation methods,routes and supports, improved construction monitoring, adopted information construction methods, and finally successfully ensured safe construction of the foundation pit.
通过制定合理的土方开挖方法、路线和支撑施工方案 ,加强施工监测 ,运用信息化施工 ,保证了基坑的安全运
3.
The construction yard around the foundation excavation support engineering of the third stage of Wangfuyuan project is narrow,so there is no place around foundation pit for material stacking and material treating,and it is difficult for soil excavation and transportation.
王府园三期基坑支护工程周边施工场地狭小,为解决地下室施工时基坑周边无材料堆放场地、加工场地及基坑大量土体同时开挖外运困难等问题,在第1层角撑四周设置材料堆场及操作平台、在基坑第1、2道对撑位置设置了栈桥,进而改善了土方场内运输条件,提高了土方开挖外运的效率,缩短了工期,节约了工程造价。
3)  earthwork excavation
土方开挖
1.
The earthwork excavation of the foundation pit project was excavated with 3 layess with depths of-4.
软土地基下基坑土方开挖分三层开挖(-4。
4)  excavation [英][,ekskə'veɪʃn]  [美]['ɛkskə'veʃən]
土方开挖
1.
According to actual engineering the excavation of foundation pit, dewatering measures and protection for surrounding buildings are discussed.
根据具体工程实例 ,对深基坑开挖、降、排水措施及对周围建筑物的保护进行了分析论述 ,提出分层开挖应采用在边坡上打钢筋桩、挂钢丝网、用 1∶3水泥砂浆进行护坡、降排水采用盲沟集水坑抽排水措施 ,达到了预期效果 ,解决了土方开挖、保护周围建筑的问
5)  earthwork [英]['ɜ:θwɜ:k]  [美]['ɝθ'wɝk]
土方开挖
1.
The paper discusses the construction design and construction method of the apply to to descend water level with light point type well in earthwork of Rank 2 earation pool,and presents the problems paying attention to at the construction.
结合工程实际阐述了二级轻型井点降水在二级曝气池土方开挖中的施工设计与施工方法,指出了施工中应注意的问题,供同行参考。
6)  rock and earth excavation
土石方开挖
1.
Several suggestions to decrease the rock and earth excavation are given.
施工中大量的土石方开挖完全毁坏了建设场地上的植被和土壤,导致大面积水土流失,增加了潜在的滑坡数量。
补充资料:土方开挖


土方开挖
earth excavation

tufong k0IWo土方开挖(earth exeavation)为工程建设将土(包括猫性土、砂土、砾、卵石及特大块石等)开采并从一处搬运至另一处的施工过程。水电工程的土方开挖包括弃土和取土。 (1)弃土是将建筑物多余土方开挖、运输、堆里在弃料场的施工过程。常用于场地平整、基础土方开挖、河道疏浚及地下工程中的土方掘进等工程。 (2)取土是在指定料场开采土料运至指定地点的施工过程。常用于天然骨料开采、土坝坝料开采、建筑物回填料等工序。尽量利用弃土做好土方平衡,是水电建设中节约资金的主要措施之一。 土方开挖根据施工条件分为陆上、水下和特殊施工3种。 陆上施工水位以上的各类土方开挖。水电工程土方开挖量大,一般都采用机械作业。机械作业在土层较厚、土壤天然含水量较低时,常用正、反铲挖掘机、斗轮回转挖掘机等立面开挖,自卸汽车、带式输送机运输。土层较薄、土壤天然含水量较高、施工场面宽大时,常用铲运机、推土机配装载机平面开挖,自卸汽车运输。坝料开采应在设计选定的料场进行。料场开采前应先清除无用覆盖层及树根、乱石等废弃物,选择合适的开采方案并根据开采运输条件和天气等因素,经常观测料场含水量的变化,并采取相应措施作适当调整以满足筑坝要求。在高边坡开挖时,要根据不同土质保持边坡稳定或及时支护以策安全。 水下施工包括砂砾料开采和特殊部位淤泥清除等。水下砂砾料开采包括天然骨料开采和坝料开采两种。特殊部位淤泥清除,如围堰过水后的基坑清淤,围堰堰体水下部分拆除等。常用的水下土方开挖机械.有索铲,正、反铲,抓斗,挖泥船和采砂船等。 特殊施工在工程特殊部位采用特殊手段的施工方法。主要有:①用风水枪配泥浆泵清除淤泥。②用高压水枪将土造成泥浆利用地形高差自流输泥至需用部位的水力冲填。③隧洞的盾构法、顶管法等(见隧洞开挖)。④在流沙地层开挖地下工程时的冻结法,即将周围土壤冰冻的开挖方法。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条