1) topsoil excavation
表土开挖
2) earthwork excavation
土方开挖
1.
The earthwork excavation of the foundation pit project was excavated with 3 layess with depths of-4.
软土地基下基坑土方开挖分三层开挖(-4。
3) earth excavation
土方开挖
1.
Foundation pit support and earth excavation of underground garage in a certain residential engineering;
某住宅工程地下车库基坑支护及土方开挖
2.
On earth excavation and support scheme;
浅谈土方开挖及支护方案
3.
Comparisons on economical and optimal plans of earth excavation;
浅谈土方开挖方案经济优化的比较
4) soil excavation
土方开挖
1.
Considering of the post-pouring concrete strain of the building,the suitable enclosure structure,the technology of curtain for cutting off water,soil excavation method was chosen and strengthening the construction monitoring to induced the harmful influence to the surroundings around the pit.
深基坑工程长近百米,周边环境复杂,施工作业条件差,结合工程设计留设的后浇带,采用适合的支护结构体系、止水帷幕技术、土方开挖方法,加强施工监测,着力于减少对周边环境的不利影响,为类似条件的深基坑工程的施工提供了有益的经验。
2.
Engineers made rational construction plans such as soil excavation methods,routes and supports, improved construction monitoring, adopted information construction methods, and finally successfully ensured safe construction of the foundation pit.
通过制定合理的土方开挖方法、路线和支撑施工方案 ,加强施工监测 ,运用信息化施工 ,保证了基坑的安全运
3.
The construction yard around the foundation excavation support engineering of the third stage of Wangfuyuan project is narrow,so there is no place around foundation pit for material stacking and material treating,and it is difficult for soil excavation and transportation.
王府园三期基坑支护工程周边施工场地狭小,为解决地下室施工时基坑周边无材料堆放场地、加工场地及基坑大量土体同时开挖外运困难等问题,在第1层角撑四周设置材料堆场及操作平台、在基坑第1、2道对撑位置设置了栈桥,进而改善了土方场内运输条件,提高了土方开挖外运的效率,缩短了工期,节约了工程造价。
5) excavation
[英][,ekskə'veɪʃn] [美]['ɛkskə'veʃən]
土方开挖
1.
According to actual engineering the excavation of foundation pit, dewatering measures and protection for surrounding buildings are discussed.
根据具体工程实例 ,对深基坑开挖、降、排水措施及对周围建筑物的保护进行了分析论述 ,提出分层开挖应采用在边坡上打钢筋桩、挂钢丝网、用 1∶3水泥砂浆进行护坡、降排水采用盲沟集水坑抽排水措施 ,达到了预期效果 ,解决了土方开挖、保护周围建筑的问
6) earthwork
[英]['ɜ:θwɜ:k] [美]['ɝθ'wɝk]
土方开挖
1.
The paper discusses the construction design and construction method of the apply to to descend water level with light point type well in earthwork of Rank 2 earation pool,and presents the problems paying attention to at the construction.
结合工程实际阐述了二级轻型井点降水在二级曝气池土方开挖中的施工设计与施工方法,指出了施工中应注意的问题,供同行参考。
补充资料:大型岩石基坑开挖
大型岩石基坑开挖
excavation of big foundation pit in rock
dax旧9 yanshi Jikeng kaiwa大型岩石荃坑开挖(exeavation of big foun-dation pit in roek)在岩石地基中开挖面积大和(或)深度大的基坑。大型岩石荃坑开挖,一般包括岩石破碎和石方挖运。随着凿岩机械、爆破器材、爆破技术和挖运机械的发展,施工技术的不断进步,大型岩石基坑开挖施工的机械化程度也越来越高,爆破成型技术更加完善,施工速度不断加快,对周围设施的影响也愈来愈小。岩石破碎常用以下方法破碎岩石形成基坑:人工破碎;机械破碎;坑中爆破、周边用人工或机械修整;光面爆破;近人爆破和静态爆破。 人工破碎松软岩石用镐、撬棍破碎;坚硬岩石用锤击钢钎破碎。人工破碎工效低,劳动强度大。 机械破碎岩石通常采用风镐破碎。 坑中爆破、周边用人工或机械修整为防止基坑周边和坑底震裂,在周边和坑底预留一定宽度或厚度,待坑内岩石爆破以后,再用人工或机械修边清底。坑内岩石常用下述方法爆破:浅孔爆破法(炮眼深度小于sm);深孔爆破法〔炮眼深度大于sm)和微差爆破法‘利用毫秒电雷管顺次起爆)。 光面爆破在爆破的最终开挖面上布置加密的深孔,并在孔内进行减弱装药或部分不装药,以使爆破时沿这些孔的连线破裂而形成平整的光面。光面爆破有四种:(l)密集空孔爆破。密集空孔的孔径一般为34~75mm,孔距为孔径的z一4倍,孔深小于xom。在开挖的轮廓线上布置密集空孔(不装药),靠近空孔布置一排减弱装药的加密炮眼。(2)缓冲爆破。沿开挖轮廓面布置一排加密炮眼,其全部或大部装减弱药包,药包紧贴在朝向自由面的深孔壁上,填充细砂以堵塞孔口,主炮起爆后再起爆缓冲爆破孔。(3)周边爆破。在开挖轮廓面上布置间距较小的炮眼和使用小直径药卷,不用填充物而采用空气间隙装药,其原理与缓冲爆破相同。(4)预裂爆破。在开挖轮廓线上布置密集孔眼,构成预裂孔眼,起爆后在预裂孔的连线上形成1一2c。宽的预裂缝,当主爆孔爆破时,爆破范围以外的岩石就可受到预裂缝的保护。 近人爆破和静态爆破近人爆破是在炮眼中装入特制的高能燃烧剂,利用其燃烧时气体的急骤膨胀而破碎岩石。此法飞石少,飞石距离小,但爆破效率较低。静态爆破是在炮眼中装入特制的膨胀剂,利用其在一定时间内的攀胀力将岩石挤裂。此法无飞石,无冲击波,无音响。近人爆破和静态爆破常在建筑物密集处或重要设施附近使用。 石方挖运可使用正铲、反铲挖掘机或抓斗将破碎的石方挖出装车运走。运距不太远时也可使用铲运机经过通道在坑底直接铲碴外运,此法效率高,成本低。常用的几种挖运石方的方法是:(1)垂直提升法。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。