说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 顶油温升
1)  top oil temperature rise
顶油温升
1.
By utilizing the fundalmental theory of heat transfer and the classical experiment heat transfer correlation equations,the calculation methods on the mean oil temperature rise and top oil temperature rise of the oil-immersed power transformers are obtained.
运用传热学基本原理和经典试验换热准则式,推导得出浸油变压器平均油温升和顶油温升的计算式。
2)  Temperature Rise of Top Layer Oil
顶层油温升
3)  top-oil temperature
顶层油温
1.
A prediction model of top-oil temperature based on Takagi-Sugeno(T-S) fuzzy model has been established to estimate HST.
为准确估算电力变压器绕组热点温度,对变压器安全运行和寿命评估提供辅助依据,建立了一个基于Takagi-Sugeno(T-S))的变压器顶层油温预测模型。
4)  abnormal high oil temperature
油温升高
1.
The fault of abnormal high oil temperature of the two windings main transformer in a 110 kV substation was discussed in detail.
对一起 110kV变电站双绕组主变压器油温升高的故障进行深入分析。
5)  oil temperature rise
油液温升
1.
The oil temperature rise which affects the reliability of oil seals significantly is the key problem which must be considered in reliability design of the DCSA.
编程分析了缸体结构尺寸和热辐射发射率对油液温升的影响规律,得出的结论可以为减振器的设计提供参考。
6)  expansion roof tank
升降顶油罐
补充资料:顶升
      利用千斤顶和交替填塞的柱块,将在地面上就地拼装或灌筑成型的屋盖结构逐步顶升到设计标高的施工方法。这种方法无需大型起重设备,可将在地面施工完毕的整个屋盖,包括屋面防水、油漆及管线等,一次顶升就位。一般有上顶升和下顶升两种。
  
  ① 上顶升法。千斤顶倒支于屋盖结构支点下的垫块上,垫块即为以后的柱帽。开始时,柱帽支承于柱基块的两侧冀上,随着千斤顶的进油和回油,填进临时垫块和换填正式柱块,柱帽即将屋盖结构逐步升高。柱块为方形和门字形(见图)。柱块在安装时宜及时铺垫水泥砂浆及焊接帮条,并对柱块的开口加以封闭,以增强柱子的稳定性。上顶升法中千斤顶的顶升重量恒定,稳定性较好,目前采用较多。因属高空作业,顶升过程中应采取措施,防止屋盖结构偏移,并注意顶升的同步。
  
  
  ② 下顶升法。千斤顶始终放在柱基上,随顶随填柱块,可以减少高空作业,但顶升重量逐渐增加,尤其是在柱基处形成活动支点,稳定性差,已较少采用。
  
  顶升法也有用格构柱的,比填柱块安全,能防止结构偏移。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条