说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 砂质滩坝
1)  sandy beach and bar
砂质滩坝
1.
The careful observations of core data,logging and 3D-seismic and petrographic analysis reveal that the 2nd member of the Shahejie Formation in the Dawangbei Sag consists of sandy beach and bar of shallow water over-lake.
通过岩心精细的观察,结合测井、三维地震以及岩石鉴定分析等资料的综合研究发现,大王北洼陷沙二段盆地断坳期为浅水漫湖砂质滩坝沉积,可分为:滩、坝主体、坝侧缘、坝间4种沉积微相,其中坝主体的成分成熟度和结构成熟度较高,且坝主体砂层最厚,滩、坝侧缘和坝间砂体次之。
2)  near lake-shore sandy bar
滨浅湖砂质滩坝
3)  beach bar sandstones
滩坝砂岩
1.
Relation between beach bar sandstones diagenesis and reservoir quality in the upper Es_4 of the Palaeogene in Boxing sag;
博兴洼陷沙四上亚段滩坝砂岩成岩作用及其与储层质量的关系
2.
Comprehensive application of technology with wave form analysis and seismic characteristic inversion to beach bar sandstones prediction-taking the area of Liang 108 in Boxing subsag as an example.;
综合应用波形分析及地震特征反演技术预测滩坝砂岩——以博兴洼陷梁108地区为例
4)  Beach-bar sandstone
滩坝砂岩
1.
Logging response characteristics of beach-bar sandstone reservoir in the west of Dongying Depression
东营凹陷西部滩坝砂岩储层测井响应特征
5)  beach-bar sand
滩坝砂
1.
Economical production technologies research and application of ultra low permeability beach-bar sand reservoirs
滩坝砂特低渗透油藏经济动用技术研究与实践
6)  shoal-bar sand body
滩坝砂体
1.
Sequence stratigraphy framework is established for sub-Es4up of Dongying Depression according to the sedimentary characteristics of lacustrine shoal-bar sand body, based on sequence stratigraphy and comprehensive analysis of seismic, logging and coring data.
针对东营凹陷沙四上亚段滨浅湖滩坝砂体沉积特征,根据层序地层学理论,在综合分析地震、测井、岩心等资料的基础上,采用地震层序、声波时差和测井曲线叠合等方法进行层序界面识别,建立了东营凹陷沙四上亚段层序地层格架,将沙四上亚段划分为一个三级层序,并根据层序内低位体系域、湖侵体系域及高位体系域发育情况,细分为7个准层序组。
补充资料:普卡基湖坝

普卡基湖坝

Pukaki Lake Control Dam


概  述

  普卡基湖坝建在新西兰坎特伯里区、普卡基(Pukaki)河上,在蒂马鲁市附近。工程目的是发电。大坝建在冰川成因的砾石、砂和粉砂层上,为碾压土坝,最大坝高61m,坝顶长823m,大坝上、下游坝壳采用冰水砾石建成,中央心墙和上游铺盖则采用取自终碛的碾压粉砂砾石。通过上游铺盖和下游排水井阻截地下渗流。大坝体积460万m3。在大坝以西约300m处建有1座单独的副坝,为普卡基渠引水建筑物,副坝为碾压土坝,坝高32m,坝顶长640m,体积125万m3。横剖面与主坝类似。普卡基湖面积174km2,最高运行水位530.7m,水位变幅14m,总库容63亿m3。渠道进水口为170m长的钢筋混凝土箱形涵洞结构,分3孔,每孔宽6.1m,高9.1m。涵洞上游侧设有闸门室,安装3扇5.9m×6.1m(高×宽)的弧形闸门来调节渠道的流量,进水口最大流量为560m3/s。普卡基渠全长12km,最终与怀奥渠汇合。陡槽式溢洪道位于大坝左坝肩处,设4扇弧形堰顶闸门,闸门尺寸为13.0m×10.7m(高×宽),陡槽长400m,下游设消力池,溢洪道泄流量3398m3/s。导流涵洞位于右岸,是座椭圆形断面的钢筋混凝土结构,高10m,宽6m,长360m。涵洞上游侧设有闸门室,安装1扇9.0m×6.0m(高×宽)的弧形闸门。闸门用于调节湖水位上升期间的流量,相当于1个泄水底孔。工作水头57m,泄流能力570m3/s。大坝于1976建成。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
灰质障壁砂坝  砂滩  砂坝  二滩拱坝  乐滩坝址 
  ©2011 dictall.com