1) Ertan arch dam
二滩拱坝
1.
Feedback analysis of material parameters of Ertan arch dam and its foundation rock;
二滩拱坝及坝基材料参数反馈分析
2.
Feedback analysis on temperature field of Ertan arch dam in operation period;
二滩拱坝运行期坝体温度场反馈分析
3.
Design and optimization study of the dam safety monitoring on the Ertan arch dam;
二滩拱坝安全监测设计及优化研究
2) Baihetan arch dam
白鹤滩拱坝
1.
Nonlinear analysis of overall safety factor for Baihetan arch dam;
白鹤滩拱坝整体安全度的非线性分析
3) Goupitan Arch Dam
构皮滩拱坝
1.
Based on the limit state of structure of Goupitan Arch Dam, stochastic finite element equations are derived and then programmed.
从构皮滩拱坝结构的极限状态出发推导随机有限元方程,进而编制程序,通过有限元程序分别对水位、渗流、温度、构造裂隙、基岩的弹模变化等对拱坝可靠度进行计算,从而找出对该拱坝可靠度影响的敏感因素。
4) Jinshuitan Arch Dam
紧水滩拱坝
1.
The control network for deformation observation for Jinshuitan Arch Dam is composed of that at horizontal and elevation.
紧水滩拱坝变形监测控制网包括平面和高程监测网,为了提高监测网精度,达到预期效果,文章着重就监测网的布设、作业中采用的技术标准和外业观测进行了讨论、分析,且对外业观测的质量进行评估,最后还对网进行了平差计算及确定了基准点。
5) Ertan dam site
二滩坝址
1.
Then,according to the size of the microfissure in rock and the morphologic characteristics of rock discs at Ertan dam site, the m.
本文首先阐述岩芯饼状断裂及其特征,进而用断裂力学的理论与方法对岩饼破坏进行了断裂扩张机制的分析,不但合理地解释了断裂特征及断裂破坏机制,且以二滩坝址为例,分析了产生钻孔岩饼的微裂纹条件及应力条件,为定量地评价坝址地应力状态,包括其大小及方向提供了一种新的方法。
6) Ertan dam foundation
二滩坝基
补充资料:拱坝应力分析
拱坝应力分析
stress analysis of arch dam
gongba yingli fenxi拱坝应力分析(stress analysis of arehdam)研究拱坝坝体和地基在各种荷载作用下的应力和变形的方法。在拱坝设计中,拱坝体形和厚度的选择,混凝土标号及地基软弱部位的加固等,均须参照应力分析的结果来确定。拱坝的应力分析,包括数学分析、结构模型试验和原型观测。原型观测是在已建成的坝上进行观测,了解其工作安全状况,校验设计结果,并为以后的科学研究提供资料。 拱坝由于结构复杂,小型工程可采用拱冠梁法。对于大型工程,过去多采用拱梁试(分)载法和结构模型试验。薄拱坝有采用有限差分法的。20世纪70年代起,逐渐采用有限单元法。 为了统一标准,在规定最大设计应力的同时,须规定应力分析方法。因拱坝的应力分布和最大拉、压应力,常随分析方法而改变。考虑各国已建成的大型拱坝都有拱梁试(分)载法的计算结果,拱坝应力分析如采用拱梁试(分)载法,可与已建拱坝进行对比,便于作出安全的评价。 拱梁试(分)载法将空间壳体化为杆系来计算,力学概念明晰,在计算过程中,能逐渐了解其力学机理,便于修改体形和调整厚度,但只能算出坝体应力。在分析地震反应、孔口影响及地基不均匀性等方面,不如有限单元法好。目前,国内外均有拱梁试(分)载法和有限单元法的通用程序。一些大型拱坝设计,常同时采用这两种方法,有时还辅以结构模型试验。