1) chance-constrained bi-level programming
机会约束2层规划
1.
In solving the transmission line maintenance scheduling optimization problem(TMSOP) under electric marketing circumstances,a chance-constrained bi-level programming model and a hybrid intelligent algorithm are put forward.
通过对电力市场环境下输电线路检修计划优化问题(TMSOP)的研究,提出基于机会约束2层规划的TMSOP模型和算法。
2) chance-constrained programming
机会约束规划
1.
Study on Chance-Constrained Programming Model of Resource Distribution and Convey in Stochastic Environments;
随机环境下资源分配与运输问题的机会约束规划模型研究
2.
A chance-constrained programming model taking interruptible load into consideration for the requirement of spinning reserve in power system
计及可中断负荷的旋转备用容量机会约束规划模型
3.
A model is established for ILM in the framework of chance-constrained programming aiming at maximizing the expected profit.
以供电公司采用可中断合同的预期收益最大化为目标,用实际收益不小于某一期望值成立的概率表示风险,构造了可中断负荷的机会约束规划模型,采用遗传算法和蒙特卡罗随机模拟相结合的方法求解。
3) chance constrained programming
机会约束规划
1.
On the basis of considering the risk reference of interruptible consumers and the impact of different power supply interruption duration on consumer interruption cost, a chance constrained programming based pricing model for interruptible loads is established, and by means of the approach that embeds Monte Carlo stochastic simulation into genetic algorithm the proposed model is solved.
在考虑了可中断用户的风险偏好及不同停电持续时间对用户停电损失的影响的基础上,建立了一种基于机会约束规划的可中断负荷定价模型,并运用在遗传算法中嵌入蒙特卡罗随机模拟的方法求解该模型。
2.
This paper discusses a distribution network with many venders,many retailers and multi-product suppliers,presents the stochastic programming model for the minimum total cost of the distribution network,in which the demand and the production are random variables,and converts chance constrained programming model to their definitive equivalents.
在需求和生产都是随机变量的情况下,建立了使分销网络总成本最小的随机规划模型,并且将机会约束规划模型转化为确定性等价类。
3.
A chance constrained programming model is built to the stochastic optimal power flow problem(S-OPF)considering load probabilistic distributions.
针对考虑负荷概率分布的随机最优潮流问题,建立了相应的机会约束规划模型。
4) chance constraint programming(CCP)
机会约束规划(CCP)
5) Chance-constrained programming(CCP)
机会约束规划法
6) Stochastic chance-constrained programming
随机机会约束规划
1.
A stochastic chance-constrained programming model is put forward for human resources program,which uses the maximum of oil output as objective and takes both cost and human requirement into account,and the process of its hybrid intelligent algorithm is provided at the same time.
人力资源规划是油藏经营管理的关键,以油气产量最大化为目标,成本、人员需求等为约束,建立了人力资源规划的随机机会约束规划模型,并给出了模型的混合智能算法。
2.
Because of randomicity of load and spot price, which construct a stochastic vector, a mathematical model is set up based on stochastic chance-constrained programming(CCP).
根据负荷和实时电价随机性的特点,将两者构成随机向量,基于随机机会约束规划(CCP)建立了数学模型。
补充资料:城市总体规划与国土规划、区域规划的关系
国土规划、区域规划、城市总体规划是在不同层次、涉及不同地域范围的发展规划。国土规划、区域规划、城市总体规划组成一个完整的规划系列,国土规划和区域规划应当是城市总体规划的重要依据。而全国和区域性的江河流域、土地利用等专业规划则是国土和区域规划的重要组成部分,城市土地利用规划又是城市总体规划的重要组成部分。
我国的国土规划、区域规划以及江河流域规划、区域性土地利用总体规划等工作起步较晚,目前正在有计划、有重点地逐步展开,还没有法定的审批程序和审批成果。而全国绝大多数城市总体规划已经各级政府按法定程序审批,并在不断完善和深化,在实际工作中存在着相互联系和交叉的情况,因此本法原则确定应当相互协调的关系是必要的。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条