说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 模糊机会约束规划模型
1)  Fuzzy chance-constrained programming model
模糊机会约束规划模型
2)  fuzzy random chance-constrained programming
模糊随机机会约束规划
1.
A fuzzy random chance-constrained programming based hybrid intelligent algorithm for quantifying the transmission reliability margin (TRM) is presented.
提出了基于模糊随机机会约束规划的输电可靠性裕度的数学模型和混合智能算法。
3)  fuzzy chance constrained programming
模糊机会约束规划
1.
Bi-level fuzzy chance constrained programming model for the production planning of the two-echelon distribution network in supply chain;
供应链二级分销网络生产计划双层模糊机会约束规划模型
2.
Optimization of logistics delivery routing problem by using fuzzy chance constrained programming
模糊机会约束规划下的物流配送路径优化
3.
A fuzzy chance constrained programming model for bi_level distribution network design in the supply chain is put forward, in which both customers demands for products and production capacity of branch plants are treated as fuzzy parameters.
提出了供应链中二级分销网络优化设计的模糊机会约束规划模型
4)  fuzzy chance-constrained programming
模糊机会约束规划
1.
Considering the uncertainty,a fuzzy chance-constrained programming model for the integrated logistics network of R/M system was presented by treating the quantities of recycled products as fuzzy parameters.
根据这一特点,将各消费区域废旧产品的回收数量看成是模糊参数,提出了该集成物流网络的模糊机会约束规划模型
2.
Thirdly, the original model was transformed into a fuzzy chance-constrained programming model based on stochastic c.
介绍了跨国供应链生产计划研究与不确定规划论在供应链计划研究中的应用;提出了包含模糊需求与随机生产能力的跨国供应链计划模型,模型中将运输成本分配因子与转让价格作为决策变量,根据随机机会约束规划等价类理论,将模型转化为模糊机会约束规划模型,并利用遗传算法与模糊模拟技术相结合的混合算法设计了模型的求解方案;最后,通过数据仿真说明了模型的有效性与适用性。
3.
Production planning with fuzzy unit profits,fuzzy capacities and fuzzy demands is descried,and an optimization model is formulated by using fuzzy chance-constrained programming.
描述了模糊单位利润、模糊生产能力以及模糊需求下的批量生产计划,并应用模糊机会约束规划规划建立了模型。
5)  fuzzy chance-constrained programming
模糊约束机会规划
1.
The paper puts forward a fuzzy chance-constrained programming model for the solid wastes reverse logistics network by treating the quantities of recycled products as fuzzy parameters.
在垃圾回收逆向物流网络中,回收的数量具有不确定性,根据这一特点,将各消费区域垃圾回收量看成模糊参数,提出了逆向物流网络的模糊约束机会规划模型,通过把模型中模糊机会约束清晰化,将模型转化为确定性的0—1整数规划模型,通过算例,针对不同的置信水平对模型进行了求解,为逆向物流网络设计提供了依据。
2.
Considering the uncertainty,a fuzzy chance-constrained programming model for the reverse logistics network of solid wastes is presented by treating the quantities of recycled products as fuzzy parameters.
在垃圾回收逆向物流网络中,回收的数量具有不确定性,根据这一特点,将各消费区域垃圾回收量看成模糊参数,提出了逆向物流网络的模糊约束机会规划模型,通过把模型中模糊机会约束清晰化,将模型转化为确定性的混合整数规划模型,通过算例对模型进行了求解,为逆向物流网络设计提供了依据。
6)  chance-constrained programming model
机会约束规划模型
1.
【Method】 This paper took pipe flow,nodal required minimal water head and pipe roughness coefficient as stochastic,established pipe network chance-constrained programming models for optimal design of water distribution network by gravity pressure and pump station.
【方法】将管段设计流量、节点最小工作水头和管道粗糙系数等参数作为随机变量,分别建立了基于随机模拟技术的重力和泵站加压两种输配水系统的机会约束规划模型;在随机模拟技术基础上,用列队竞争算法对该模型进行求解。
2.
We Propose chance-constrained programming model for the problem.
通过讨论随机条件下仓库布局问题,建立了随机仓库布局问题机会约束规划模型,并设计出基于随机模拟的禁忌搜索算法求解模型,最后利用算例来验证算法的有效性。
补充资料:城市总体规划与国土规划、区域规划的关系

国土规划、区域规划、城市总体规划是在不同层次、涉及不同地域范围的发展规划。国土规划、区域规划、城市总体规划组成一个完整的规划系列,国土规划和区域规划应当是城市总体规划的重要依据。而全国和区域性的江河流域、土地利用等专业规划则是国土和区域规划的重要组成部分,城市土地利用规划又是城市总体规划的重要组成部分。
我国的国土规划、区域规划以及江河流域规划、区域性土地利用总体规划等工作起步较晚,目前正在有计划、有重点地逐步展开,还没有法定的审批程序和审批成果。而全国绝大多数城市总体规划已经各级政府按法定程序审批,并在不断完善和深化,在实际工作中存在着相互联系和交叉的情况,因此本法原则确定应当相互协调的关系是必要的。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条