2) tailing phase
拖尾阶段
1.
At phaseⅠthe concentration could be recovered by VOCs transfer after continuously venting or intermittent venting, it depended on VOCs seepage into soil and absorption of NAPLs on it, dissolution into the soil water; PhaseⅡ was well-known tailing phase.
SVE过程中VOCs气相浓度降低,停止抽提后浓度能够恢复;(2)低效率的拖尾阶段,即土壤中无NAPLs存在,通风能够快速地降低污染物浓度,并且VOCs浓度降低后不能恢复。
3) stage acceptance of project
阶段验收
5) while-listening
收听阶段
6) staggered oil recovery ratio
阶段采收率
补充资料:收尾
1.煞尾;结束。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条