说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 第一造床流量
1)  first bed-forming discharge
第一造床流量
1.
The first bed-forming discharge represents equivalent discharge of sediment transporting capacity in variable discharge process,i.
第一造床流量是代表变动流量过程输沙能力的等价流量,即塑造河道纵剖面的造床流量,其能从理论上确定。
2)  the method of the second bed-forming discharge
第二造床流量法
1.
It is difficult to explain the reason of higher regulation water level determined by the method of the second bed-forming discharge because of the lack of understanding on the theoretical basis,basic concept and applicability of the method.
航道整治工程中整治水位的确定关系到工程的成败,以往采用的第二造床流量法在部分河段出现了确定值偏高的情况,但由于对该方法的理论基础、基本概念、适用条件认识不足,人们难以解释偏高原因。
3)  second bed-forming discharge
第二造床流量
4)  dominant discharge
造床流量
1.
Analysis of dominant discharge on the middle and lower reaches of the Songhua River;
松花江中下游造床流量分析
2.
On the basis of analyaing and summarizing the achievements of predecessors about the dominant discharge, considering the characters of heaVy sediment laden river, this paper presents a method to determine the dominant discharge of heaVy sediment-laden river, in which the frequencies of discharge and sediment concentration are used.
在综述和分析前人有关造床流量研究成果的基础上,根据多沙河流的特点,提出了一种适用于多沙河流造床流量计算的水沙综合频率法。
5)  bed forming discharge
造床流量
1.
To calculate transverse and longitudinal profile morphology under the conditions of reaching the bal ance of design conditions of water and sediment by using the first and second bed forming discharge, analysis and compare with the morphological feature of the Sanmenxia Reservoir, it has obtained that the design for mation and effective storage of the Xiaolangdi Reservoir are Conservative.
用第一、第二造床流量概念对小浪底水库设计水沙条件下达到平衡时纵、横剖面形态进行计算,并且与三门峡水库形态特征进行对比分析,从而得出小浪底水库设计形态和有效库容是偏于保守的,正常运用期能够保持51亿m~3的有效库容(含10亿m~3槽库容)调节运用,在实际运用中有效库容可能会更大。
6)  bed-forming discharge
造床流量
1.
0 m downstream of the Lijin hydrometric station;c) that with the released flow rate greater than 2 500 m3/s,the bed-forming discharge over the whole lower river was increased;d) that the concern that the channel in the Shandong Province would be in sedimentation has been eliminated.
③进入下游河道流量在2500 m3/s以上,保证了全河冲刷;同时尽可能避免了中、小流量,未出现山东河段的回淤,从而使全河造床流量均匀加大。
补充资料:第一
1.等第次序居首位或首位的。 2.形容程度最深;最重要。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条