1) finishing length
加工长度
2) maximum machining length
最大加工长度
3) cutting step
加工步长
4) makespan
加工全长
1.
Given a group of coupled-task job, the coupled-task problem asks to find a processing sequence and a corresponding schedule on a single machine with the objective of minimizing the makespan.
给定一组耦合工件,要求确定这些工件在一台机器上的加工顺序及时间安排,使加工全长达到最小,这就是耦合工件组作业问题。
2.
This paper deals with the makespan problem of flow shops with a transportation turntable,which is used for moving the jobs from any machine to the next machine,for moving the jobs from the entrance to the first machine,and for moving the jobs from the last machine to the entrance back as well.
在本文中,我们证明,即使只有一台加工机器,带有转盘的流水作业的加工全长问题也是强NP困难的。
3.
This paper is concerned with the makespan problem of scheduling groups of jobs in two machine open shop.
讨论关于工件组的两机自由作业时间表的加工全长问题。
5) Processing to length
定长加工
6) makespan
加工总长
1.
Computational complexity of the makespan of the three-stage flow-shop with some batch machines;
含有批处理机的三机流水作业加工总长问题的计算复杂性
2.
In this paper, we investigate the computational complexity of the makespan of the three-stage flow-shop with some batch machines in some cases.
本文研究含有批处理机的三台机器流水作业加工总长问题在某些情形下的计算复杂性。
3.
It is conjectured that the makespan of any dense schedule is at most 2-1/ m times the optimal makespan, where m is the number of machines.
其加工总长与最优值之比具有上界 2 - 1 /m(m为机器数 ) ,是一个尚未证明的猜想。