2) Beijing-Shijiazhuang section of Middle Route of the South-to-North Water Transfer Project
南水北调中线京石段
3) the middle route of south-to-north water transfer project
南水北调中线
1.
Design for Water Contract of "Water Bank" in the Middle Route of South-to-North Water Transfer Project;
南水北调中线“水银行”的水合约设计思路初探
4) Middle Route of South-to-North Water Transfer Project
南水北调中线
1.
Aimed to study on whether constant water levels immediate at the upstream of control gates can be maintained in the Middle Route of South-to-North Water Transfer Project,the different unsteady flow transitional processes are simulated when inflow at the head,openings of control gates and the flow rates divided by outlets are changed simultaneously.
南水北调中线输水渠道中,针对同时操作闸门是否仍能维持闸前水位为常值,模拟计算了同时改变渠首流量、闸门开度和分水口流量时渠道中的非恒定过渡过程。
2.
Based on the middle route of South-to-North Water Transfer Project,the sensitivity analysis to the characteristic parameters that reflect the variations in diversion discharge is done and then the effect of these parameters on hydraulic response of channel is researched by mathematical model.
现以南水北调中线总干渠为研究对象,通过构建一维的非恒定流仿真模型,对表征分水口流量变化的特征参数进行敏感性分析,研究其对渠道水力响应的影响程度以及规律,研究表明,分水流量增加(减小)幅度与渠道的水位降落(升高)速率呈线性正比关系,分水流量的变化幅度是影响渠道水位变化速率的敏感因素;最后对相邻分水口取水流量配合变化的模式进行研究,指出在可能的情况下,相邻分水口的流量分配可以按照相互补充的方式进行调节。
5) MRP
南水北调中线
1.
The Middle Route Project(MRP)of the Southto-North Water Transfer Project is a large trans-basin and trans-province project,while water supply control of the middle route is a very complicated theoretical and practical problem which concerns with many elements like engineering technology,market operation and management mechanism.
南水北调中线是一项跨流域、跨省市的特大型调水工程,中线供水调度是一个极其复杂的理论和实践问题,涉及工程技术、市场运作和管理机制等因素。
2.
The paper presents the real-time water supply theory and integrated frame of MRP(Middle Route Project),including water structure and its definition.
介绍了南水北调中线实时调度的原理和总体框架,提出了供水结构的划分和内涵定义。
6) Mid-route of South-to-North Water Transfer Project
南水北调中线
1.
Discussion on demand side management of water supply load for Mid-route of South-to-North Water Transfer Project;
南水北调中线需求侧供水负荷管理调度初探
2.
Research on hydraulic design and flow characteristics of the tunnels: Mid-route of South-to-North Water Transfer Project;
南水北调中线工程隧洞水力设计及水流特性研究
3.
Analysis and evaluation on geological condition of emergency water supply project:Mid-route of South-to-North Water Transfer Project;
南水北调中线京石段应急供水工程地质条件分析与评价
补充资料:南水北调
南水北调
south-to-north water transfers
nonshUi beidiGO南水北调(south一to一north water transfers)中国的南水北调是从长江向黄河、海河和淮河流域引水的跨流域调水工程。 中国的水资源并不富裕,且水土资源分布不均。北方的黄河、淮河、海河3个流域的耕地约占全国的40%,而水资源仅占8%,是严重缺水地区。靠当地水资源已难以保证当前正常用水要求,更无法解决将来可持续发展的需水要求。长江水量丰富,其人均水量为黄河、淮河、海河3个流域的4.4倍,年平均人海量约9以1〕亿立方米,有余水可以北调。 自20世纪50年代初提出南水北调设想,经过几十年的研究,为解决华北和西北的水资源紧缺问题,初步形成分别从长江上游、中游和下游调水的南水北调西线、中线和东线3项工程。这3项工程各有其合理的供水范围,不能互相替代,但可以相辅相成。西线主要供黄河中上游地区,中线主要供黄淮海平原西部,东线供淮海平原东部及胶东地区。 西线1952年组织考察,1987年开始列为超前期工作项目。目前,此项目仍在继续调研。 西线工程地处青藏高原,海拔高程3(X幻米以上。初步研究了技术经济比较现实的从长江上游通天河及支流雅碧江和大渡河引水人黄河的方案。长江各引水河流引水枢纽处的高程较人黄河相应处的高程低350~45()米,长江与黄河之间有巴颜喀拉山阻隔。因此,西线工程需筑高坝塑水或用泵站提水,并开凿长隧洞穿越分水岭。通天河调水在青海省玉树以西楚玛尔河口至巴塘曲口段建坝奎水,再自流或抽水穿过分水岭于扎陵湖至达日之间进人黄河。不同方案的坝高1叩~又9米,隧洞长巧0多千米,抽水方案的扬程为419米。雅碧江调水在四川省石渠以东宜牛至仁青里河段建坝塞水,自流或抽水穿过分水岭于青海达日附近人黄河。不同方案的坝高152~237米,隧洞长150多千米,抽水方案的扬程为416米。大渡河调水在四川阿坝以南大渡河支流足木足河上的斜尔孕建坝(坝高2肠米)童水,再建泵站(扬程为488米),并开凿29千米的隧洞至甘肃玛曲县南部人黄河。通天河与雅碧江也可以联合调水,即将通天河水引人雅碧江,再在雅碧江建坝凿洞人黄河。3条河最大可能引水量为195亿立方米,其中通天河100亿立方米,雅着江45亿立方米,大渡河50亿立方米。 西线工程是解决西北干早缺水的重大设施,可为黄河中上游地区的青、甘、宁、内蒙古、陕、晋6省区发展灌溉3仪旧万亩,提供城镇生活和工业用水oo亿立方米,将促进西北经济发展和生态环境改善。 中线50年代做过工作,so年代进行规划,卯年代初完成了引江工程规划和可行性研究报告。 中线工程总的设想分两步实施,第一步从汉江的丹江口水库引水,第二步再从长江引水到汉水,增加北调水量。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条