说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 关键链项目管理(CCPM)
1)  Critical Chain Projects Managing(CCPM)
关键链项目管理(CCPM)
2)  Critical chain project management
关键链项目管理
1.
Study on application boundary conditions of Critical Chain Project Management(CCPM);
关键链项目管理(CCPM)方法应用边界条件研究
2.
Applying the supply chain management and the critical chain project management in the EPC project is advantageous to guard against the risk and the uncertainties.
供应链管理和关键链项目管理在EPC项目中的并用,有利于防范工程项目的风险与不确定性。
3)  CCPM
项目关键链管理
1.
CCPM makes improvements over the disadvantages of CPM.
指出了关键路线法 (CPM)现存在的问题 ,介绍了近年来在国外兴起的项目关键链管理 (CCPM)的基本思想和对 CPM的改进。
4)  Critical Chain Project Management (CCPM)
关键链项目计划管理
5)  critical chain project management(CCPM)
关键链项目管理方法
1.
Analysed and compared two of different PM softwares which based on the CPM and CCM individually in terms of theory and application,also pointed out the tendency that critical chain project management(CCPM) would be applied to the mainstream PM software.
从理论和应用角度分析比较了基于关键路径和关键链的项目管理软件,指出关键链项目管理方法(CCPM)引入主流项目管理软件中的必然趋势。
6)  multi-project critical chain
多项目关键链
1.
According to the multi-project critical chain(MPCC) theory,a new planning management process including planning template,planning scheduling and controlling were presented;every part was consisted of several steps;detailed application method of every step were designed.
根据多项目关键链原理,提出了包含以计划模板建立、计划编制、控制三个部分的计划管理流程;每个部分又划分为若干个步骤;针对步骤分别详细设计了具体应用方法。
补充资料:关键
①门闩或功能类似门闩的东西。②比喻事物最关紧要的部分;对情况起决定作用的因素:摸清情况是解决问题的~丨办好学校~在于提高教学质量。③最关紧要的:~问题丨~时刻。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条