1) The Maerdang hydropower station on the Yellow River
黄河玛尔挡水电站
2) the Maerdang hydropower station
玛尔挡水电站
3) Daxia Hydropower station on the Yellow River
黄河大峡水电站
4) Banduo hydropower station of the Yellow River
黄河班多水电站
1.
Waste grassland is the main native ground type in the project of Banduo hydropower station of the Yellow River.
荒草地是黄河班多水电站工程区最主要的原生地面类型,阐明其产流过程,可为揭示与评价该工程区水土流失过程与强度奠定重要基础。
5) Gongboxia Hydropower Station
黄河公伯峡水电站
1.
Calculation of Design Flood for Gongboxia Hydropower Station;
黄河公伯峡水电站设计洪水计算
2.
In view of optimal design of construction flood for Gongboxia Hydropower Station, this set of method is briefly introduced, and a clearer reply is given to some viewpoints and doubts existed for the time being.
通过黄河公伯峡水电站施工洪水优化设计过程对该套方法作简要论述,并就目前存在的一些观点及疑问给予了较为明确的回答。
补充资料:大峡水电站
大峡水电站 |
Daxia Hydropower Station |
概 述 |
大峡水电站位于中国甘肃省皋兰县黄河干流上。工程以发电为主,兼有灌溉效益。混凝土重力坝,最大坝高72m,水库总库容0.9亿m3。装机容量32.45万kW,年发电量15.58亿kW·h,灌溉面积0.87万hm2。 |