2) fixation of tower and beam
塔梁固结
1.
By comparing the actual load effects with the design analysis model,results show that: the stiffness and load-bearing capacity of the bridge meet the design and use requirements;the fixation of tower and beam,auxiliary piers,multi-room box structure can effectively improve torsional rigidity.
通过比较该桥的实际加载效应和设计分析模型,结果表明:该桥的刚度和承载能力满足设计和使用要求;采用塔梁固结,辅助墩,多室箱梁的结构形式能有效的提高抗扭刚度。
3) pylon and girder temporary fixity
塔梁临时固结
1.
In the process of cantilever construction of the main girders of the bridges,the commonly-used method of pylon and girder temporary fixity often results in cracks in the vicinity of Segments No.
预应力混凝土斜拉桥跨径不断增大,主梁宽度也不断增加,其空间效应越来越明显,在其主梁的悬臂施工过程中,通常采用的塔梁临时固结方式常常导致主梁0号块附近开裂。
4) fixed pier-pylon-beam system
塔梁墩固结体系
5) fix-jointed bridge tower and girder
塔梁固接
6) pylon-girder connection
塔梁联结
1.
Taking Dangshi Bridge for example, analysis is made of the influence of different forms of pylon-girder connection on the structure before and after the main girder side spans are joined, including comparison and verification With the in-situ measurement during construction.
本文以宕石大桥为例,分析了塔梁联结方式的不同对主梁边跨合拢前后结构影响的差异,并与施工实测结果进行了对比、验证,仅供参考。
补充资料:星接阻抗和三角接阻抗的变换
星接阻抗和三角接阻抗的变换
transformation between starc-onnected and delta-connected impedances
x ing]一e乙日kongl介e sonJ一00}Iez日伙ongde匕一。一〕huon星接阻抗和三角接阻抗的变换(t ransfor-mation betweenstar一eonneeted and delta-eonneeted imPedanees)接成星形的三个阻抗和接成三角形的三个阻抗互相替代的等效变换。它们之间的关系可用一组变换公式表示。按这组公式,用星接阻抗替换三角接阻抗或者反过来,不会影响稳态下电路其他部分的正弦电压和电流,常用于对称三相电路的分析和计算。 图1为三个阻抗21、Z:、23接成星形(又称丫形)。图2为三个阻抗Z小22。、Zal接成三角形(又称△形)。它们之间的变换公式如下:人23土图1星接阻抗图2三角接阻抗(1)将星形连接变换成三角形连接212一Z:+22+2 122及3一22+za十警(1)、|冬|矛231一23+21+2321(2)将三角形连接变换成星形连接z、-二一典乒兴-) 艺‘2士乙“3十乙31…_2 oqZI,}Z。一下万~一二-二二-汁 乙‘2士乙23十乙3‘1_Z。IZoq}艺q一二二一~二,二二--,-二二-~J 乙12十乙23十艺32夕(2) 当三个星接阻抗相等,即21一Z:一23一z丫、三个三角接阻抗相等即212一223一231一Z△时,变换公式是 Z二一32丫,Z丫一Z△/3
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条