3) drain cavity
放水发电洞
1.
Vibrating test and safety evaluation on drain cavity in Yuqiao reservoir;
于桥水库放水发电洞现场振动检测及安全评估
4) water-supply power tunnel
供水发电洞
1.
This paper introduces the general situation of Hengquan Reservoir project, expounds the setting up of the orifice of intake tower of water-supply tunnel, and calculates the aerial drainage of water-supply power tunnel.
介绍了横泉水库工程概况,论述了供水发电洞进水塔孔口设置,对供水发电洞泄流进行了计算。
5) water diversion and power generation tunnel
引水发电洞
1.
The optimization program was developed by analysis of geological conditions of different rock sections surrounding water diversion and power generation tunnel in the Xiabandi Key Water Control Project in Xinjiang.
通过对新疆下坂地水利枢纽工程引水发电洞不同围岩段地质条件进行具体分析,提出隧洞衬砌型式的优化方案。
6) intake tower for long spillway tunnel
深孔泄洪洞进水塔
补充资料:泄洪洞
见水工隧洞。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条