1) back well method excavation
反井法开挖
1.
Summarization on large diameter vertical shaft back well method excavation construction technology
关于大直径竖井反井法开挖施工技术概述
2) well-point excavation method
井点排水开挖法
3) Inclined shaft excavation
斜井开挖
1.
Safety management of inclined shaft excavation was the whole process for safety production supervision,examination management and security control in the construction.
在抽水蓄能电站中斜井开挖施工历来是一个难点。
4) shaft excavation
竖井开挖
1.
The effective performance of grouting is an important keypoint for a successful shaft excavation.
地下水影响竖井开挖工作甚巨,竖井开挖成败除了地质因素外,有效之止水灌浆工作亦为主要关键。
5) excavation of cylinder
沉井开挖
1.
Combined with engineering of cylinder type sewage reservoir, it introduces construction process and method of major procedure of cylinder type sewage reservoir, which including fabrication of cylinder、excavation of cylinder、sealing of cylinder, security measures are putted forward to ensure quality reaching standard.
结合某污水处理池工程实践,介绍了污水池沉井制作、沉井开挖、沉井封底等主要工序的施工程序及施工方法,并提出了施工安全措施,从而使工程质量达到设计及规范要求。
6) Shaft exca vation
立井开挖
补充资料:斜井
见矿山井巷。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条