2) man digging method
人工开挖法
3) engineering excavation
工程开挖
1.
It is analysed of the surface movement resulting from engineering excavation, such as underground mines, open-pit mining, railway, highway, foundation pit, tunnel and underground engineering, and its deformation's characteristics.
分析了地下矿山、露天矿山开采 ,铁路、公路、基坑、隧道和地下工程开挖引起的周围地表移动与变形的特点。
4) excavation
[英][,ekskə'veɪʃn] [美]['ɛkskə'veʃən]
开挖施工
1.
Technical control of the excavation of spillway for the Gongboxia Hydropower Station;
公伯峡水电站溢洪道开挖施工的技术控制
2.
The various measures,such as pre-casting through advanced installed pipe shed,grille steel frame or profiled bar support,top arch net, system rockbolt,and injecting concrete,were used to deal with the technical difficulties under bad geological conditions during excavation of tunnel within V type surrounding rocks.
着重介绍在景洪水电站左岸下游渣场排水洞开挖施工中,对于Ⅴ类围岩洞段,针对不良地质条件下的隧洞开挖施工技术难点,应用超前小管棚预注浆、格栅钢架(或型钢支撑)、顶拱挂网、系统锚杆、喷射混凝土等多种支护措施,安全顺利地进行隧洞锁口和通过洞身段长达574 m的Ⅴ类围岩洞段,其中还包含3条断层破碎带。
3.
The excavation of left bank abutment of the Hongjiadu hydroelectric project was the highest cut slope in the hydropower construction project then.
为此,在开挖施工中,施工单位针对坝肩的地层岩性、地质构造及地形特点,通过精心组织,强化过程质量管理,有效地保障了开挖质量和边坡施工安全。
5) excavation construction
开挖施工
1.
By introducing the excavation construction of tunnels type ancho r hole in the Second Changjiang Rivers in Chongqing Wanzhou, brief summary and the ana lysis to construction technology of tunnels type anchor hole for rope bridge wer e presented.
本文介绍了重庆市万州区长江二桥隧道式锚洞的开挖施工,对悬索桥隧道式锚洞的施工技术作一简要的总结和分析。
2.
The paper presents the features and difficulties in excavation and support of the surge shaft of Lijie hydropower station on the Bailongjiang river,and describes various technical measures taken in excavation construction as well.
介绍白龙江立节水电站调压井开挖施工的特点、难点以及在开挖施工中采取的各种技术措施。
补充资料:大型岩石基坑开挖
大型岩石基坑开挖
excavation of big foundation pit in rock
dax旧9 yanshi Jikeng kaiwa大型岩石荃坑开挖(exeavation of big foun-dation pit in roek)在岩石地基中开挖面积大和(或)深度大的基坑。大型岩石荃坑开挖,一般包括岩石破碎和石方挖运。随着凿岩机械、爆破器材、爆破技术和挖运机械的发展,施工技术的不断进步,大型岩石基坑开挖施工的机械化程度也越来越高,爆破成型技术更加完善,施工速度不断加快,对周围设施的影响也愈来愈小。岩石破碎常用以下方法破碎岩石形成基坑:人工破碎;机械破碎;坑中爆破、周边用人工或机械修整;光面爆破;近人爆破和静态爆破。 人工破碎松软岩石用镐、撬棍破碎;坚硬岩石用锤击钢钎破碎。人工破碎工效低,劳动强度大。 机械破碎岩石通常采用风镐破碎。 坑中爆破、周边用人工或机械修整为防止基坑周边和坑底震裂,在周边和坑底预留一定宽度或厚度,待坑内岩石爆破以后,再用人工或机械修边清底。坑内岩石常用下述方法爆破:浅孔爆破法(炮眼深度小于sm);深孔爆破法〔炮眼深度大于sm)和微差爆破法‘利用毫秒电雷管顺次起爆)。 光面爆破在爆破的最终开挖面上布置加密的深孔,并在孔内进行减弱装药或部分不装药,以使爆破时沿这些孔的连线破裂而形成平整的光面。光面爆破有四种:(l)密集空孔爆破。密集空孔的孔径一般为34~75mm,孔距为孔径的z一4倍,孔深小于xom。在开挖的轮廓线上布置密集空孔(不装药),靠近空孔布置一排减弱装药的加密炮眼。(2)缓冲爆破。沿开挖轮廓面布置一排加密炮眼,其全部或大部装减弱药包,药包紧贴在朝向自由面的深孔壁上,填充细砂以堵塞孔口,主炮起爆后再起爆缓冲爆破孔。(3)周边爆破。在开挖轮廓面上布置间距较小的炮眼和使用小直径药卷,不用填充物而采用空气间隙装药,其原理与缓冲爆破相同。(4)预裂爆破。在开挖轮廓线上布置密集孔眼,构成预裂孔眼,起爆后在预裂孔的连线上形成1一2c。宽的预裂缝,当主爆孔爆破时,爆破范围以外的岩石就可受到预裂缝的保护。 近人爆破和静态爆破近人爆破是在炮眼中装入特制的高能燃烧剂,利用其燃烧时气体的急骤膨胀而破碎岩石。此法飞石少,飞石距离小,但爆破效率较低。静态爆破是在炮眼中装入特制的膨胀剂,利用其在一定时间内的攀胀力将岩石挤裂。此法无飞石,无冲击波,无音响。近人爆破和静态爆破常在建筑物密集处或重要设施附近使用。 石方挖运可使用正铲、反铲挖掘机或抓斗将破碎的石方挖出装车运走。运距不太远时也可使用铲运机经过通道在坑底直接铲碴外运,此法效率高,成本低。常用的几种挖运石方的方法是:(1)垂直提升法。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条