1) mid-span closing
中跨合龙
3) middle span closure
跨中合拢
4) the closure gaps of the main spans
中跨合拢方案
5) gantry cross truck
龙门跨车
6) middle span
中跨
1.
Combined with the specific project example,it analyses the affecting factors of the construction of continuous rigid frame joint section and the construction requests,specifically introduces the construction technology of the side span,middle span joint section of continuous rigid frame,to perfect the construction technology of joint section,and this can supply good reference to related projects.
结合具体工程实例,分析了连续刚构合拢施工的影响因素和施工要求,详细地介绍了连续刚构边跨和中跨合拢段的施工工艺,以完善连续刚构合拢段施工工艺,可为相关工程提供很好的工程借鉴作用。
补充资料:合龙
合龙
breach blocking
水流仍可通过,待全部沉厢就位后,在一次合适的平潮期,同时放下闸门,完成合龙。(徐福龄)称为合龙桩。将合龙大缆拉过龙门口,结活扣于两金门占的合龙桩上(图l、。然后用麻绳编结成网称为龙衣。网眼0.15一0.2米见方,网的长宽尺度应与龙门口大致相等,网结成后,用木杆或大竹竿做心,将龙衣卷成捆,并把龙衣的引绳头牵过对岸,这时数人横躺在龙衣上,推卷前进,同时用小绳将龙衣与合龙缆扎紧,随滚随扎,直到对岸。龙衣铺成后,即推放一层秸料,以能上人走动为宜,愈向中间,因为人与料的重量下压,使绳伸长垂成弧形,然后上五花骑马桩,压土袋,如此层层相压,做到一定高度,在两金门占统一指挥同时松绳沉绿入水,并继续加料上土,上五花骑马桩直至压绿到底,把口门堵塞合龙。在用双坝进堵时,应使正坝合龙后,再进行边坝合龙,在水大流急的情况下,用合龙绿合龙,往往由于松绳不匀,会发生卡埔或扭绿现象,如塌压不到底,绿底下流速加大,冲刷河底,如金门占发生蛰动,有功败垂成的危险。i扣一洲亦可采用竹笼装石或铅丝笼装石成枕,按上法进行投.这种枕易于下沉入水。抛枕合龙主要优点是施简单,进堵迅速,比较稳妥,缺点是枕与枕间的空大,漏水较严重,在用双坝合龙时,一般正坝用抛合龙,边坝用合龙缔合龙,以利闭气。 1956年中国江苏省射阳县新洋港截流工程,因汐吞吐量大,口门缩小,河底不断冲深。在进堵归口门先用柴石枕护底,在夏船上施工,夏船一般用组双拼或双组对尾双拼两种组合,施工时在岸上观视距。控制夏船位置,均由河心分向两岸移船倒主利用低水潮时,双组夏船的前船掀第一路柴石枕;船掀第三路柴石枕,抛完后再移船分别补抛二、四路,单组夏船则按控制线依次抛枕,互相紧密衔接(图3),为避免重迭漏空现象,当护底后,趁平潮f用船装石,普遍抛大块石一层,填补柴石枕空隙.期平整,然后用捆厢蹄进占,口门缩窄至107米日抛工隙枕潮么单测虱后两见么以卜 抛枕合龙当口门缩窄,用合龙绿不易堵合时,龙门口可适当放宽至30一60米,进行抛枕合龙,有护底抗冲的作用,捆柳柴石枕的方法,一为散柳柴包石(或淤泥)捆枕;二为柳柴把包石捆枕(见图2)。枕中放置龙筋绳,枕的直径0.8一l米,长10一20米。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条