说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 紫坪铺水利工程
1)  Zipingpu hydraulic projectt
紫坪铺水利工程
2)  Zipingpu water conservancy project
紫坪铺水利枢纽工程
1.
Zipingpu water conservancy project is located at upriver of Minjiang, and the excavated slope is about 300m high with soft rock widely distributing in the bed rock.
岷江紫坪铺水利枢纽工程修建于含软岩的地层环境中,工程开挖边坡高达300m±。
3)  Zipingpu Project
紫坪铺工程
1.
Distribution of Abandoned and Old Coal Mines in the Dam Area at Zipingpu Project;
紫坪铺工程坝区废旧煤洞的分布特征
2.
Due to complex and varied geological conditions for 4 headrace tunnels at Zipingpu Project , real time monitoring technique was used during informatization construction according to new Austrian tunneling method , system observation for typical sections was conducted by following in situ construction , based on which inverse analysis for rock mechanics parame.
针对紫坪铺工程 4条引水发电隧洞复杂多变的地质条件 ,采用新奥法隧洞信息化施工中倡导的实时动态监测技术 ,跟踪现场施工进行了典型断面的系统观测 ,在此基础上进行了围岩宏观力学参数的反分析研究。
4)  Zipingpu Hydro Project
紫坪铺水利枢纽
1.
Implementation and analysis on emergency monitoring of Zipingpu hydro project after Wenchuan earthquake;
汶川特大地震中紫坪铺水利枢纽工程应急监测的实施和分析
2.
Based on the features of the deformation and slide of the diversion tunnel overburden slopes in Zipingpu Hydro Project,the monitored points of surface displacement were established to monitor the deformation area in time.
针对紫坪铺水利枢纽工程导流洞覆盖层边坡变形和滑动的特点,及时地建立了地表位移监测点,对变形区进行监控。
5)  Zipingpu reservoir
紫坪铺水库
1.
Application of Fractal Theory in the Stage Analysis of Flood Season in Zipingpu Reservoir;
分形理论在紫坪铺水库汛期洪水分期中的应用
2.
Based on digital seismograms recorded by Zipingpu reservoir digital seismic network and YZP station of Chendu Digital Tele-seismic Network from August 2004 to May 2008 before the M8.
利用紫坪铺水库数字地震台网和成都区域数字台网中的油榨坪台2004年8月到2008年5月12日汶川大地震前的紫坪铺库区2级以上地震波形资料,采用Atkinson方法计算了紫坪铺水库库区地震波非弹性衰减系数、几何扩散系数和介质品质因子;利用Moya等提出的方法计算了台站场地响应;对震源谱的低频水平和拐角频率进行了联合反演,并计算了紫坪铺库区287次1。
3.
The focal mechanism parameters of 262 small earthquakes recorded by Zipingpu reservoir earthquake monitoring network are calculated.
用紫坪铺水库专用台网的地震记录测定紫坪铺水库区262次小震震源机制参数,结果表明:节面I的优势方向与断裂走向展布一致性很好;库区地震断层有逆断层、正断层、左旋和右旋走滑断层,走滑断层占45%;库区断层66%陡峻,35%几近直立;受水库蓄水的影响,2006年7月1日后以走滑断层活动方式明显增多,水库地震群时段走滑断层活动方式表现突出。
6)  Zipingpu hydropower station
紫坪铺水电站
1.
Integrated Automation System of Zipingpu Hydropower Station;
紫坪铺水电站综合自动化系统
补充资料:葛洲坝水利枢纽二期工程的工地


葛洲坝水利枢纽二期工程的工地


葛洲坝水利枢纽二期工程的工地
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条