说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 紫萍铺水利枢纽
1)  Zipingpu hydroproject
紫萍铺水利枢纽
2)  Zipingpu Hydro Project
紫坪铺水利枢纽
1.
Implementation and analysis on emergency monitoring of Zipingpu hydro project after Wenchuan earthquake;
汶川特大地震中紫坪铺水利枢纽工程应急监测的实施和分析
2.
Based on the features of the deformation and slide of the diversion tunnel overburden slopes in Zipingpu Hydro Project,the monitored points of surface displacement were established to monitor the deformation area in time.
针对紫坪铺水利枢纽工程导流洞覆盖层边坡变形和滑动的特点,及时地建立了地表位移监测点,对变形区进行监控。
3)  Zipingpu water conservancy project
紫坪铺水利枢纽工程
1.
Zipingpu water conservancy project is located at upriver of Minjiang, and the excavated slope is about 300m high with soft rock widely distributing in the bed rock.
岷江紫坪铺水利枢纽工程修建于含软岩的地层环境中,工程开挖边坡高达300m±。
4)  hydraulic complex
水利枢纽
1.
Closure gate design for diversion tunnel of Xiaorongjiang Hydraulic Complex;
小溶江水利枢纽导流洞封堵闸门设计
2.
Sanzuodian hydraulic complex locates at the downstream of the influent Yen river of Xiliao river in Chifeng city, Inner Mongolia, which is the key project for flood control and water supply for the city in the basin plan of Songhua river and Liao river, which main task is to improve the flood control and water supply standard where locates at the distance 35Km from hydraulic complex.
 三座店水利枢纽工程位于内蒙古赤峰市境内西辽河支流阴河下游,是列入松花江和辽河流域规划和赤峰市城市防洪供水规划的重点骨干工程,主要任务是提高位于枢纽下游35km处的赤峰市的防洪标准以及向赤峰市供水。
5)  hydro-junction
水利枢纽
1.
Study on coupling of 3D visualization with numerical simulation for powerhouse excavation of a certain hydro-junction;
某水利枢纽厂房开挖三维可视化与数值模拟耦合研究
2.
Discussion on seepage prevention of deep overburden layer ofXiabandi hydro-junction in Xinjiang;
新疆下坂地水利枢纽工程深覆盖层防渗问题探讨
3.
Video monitoring system has been widely applied in safe production monitoring for hydro-junction, and gradually developed from traditional security monitoring to management monitoring.
视频监控系统在水利枢纽的安全生产监控中应用非常普遍,并逐步由传统的安防监控向管理监控发展,进行模拟系统的网络化、数字化改造将是必然趋势。
6)  hydro junction
水利枢纽
1.
Based on analyzing affecting factors of the designed lowest navigable stage, the problem of calculating the designed lowest navigable stage at downstream stretch of hydro junction is generalized as a nonlinear functional relation between input and output.
在分析影响水利枢纽下游河段设计最低通航水位因素的基础上 ,将设计最低通航水位计算问题概括为一种非线性输入输出的泛函关系 ,以人工神经网络原理建立推算水利枢纽下游河段设计最低通航水位的BP神经网络模型 。
2.
In this paper, achievements gained in conservating soil and water conservation plantation in Wanjiazhai hydro junction region have been introduced.
本文介绍了万家寨水利枢纽区水土保持林建设所取得的成绩。
补充资料:紫萍测定法
分子式:
CAS号:

性质:利用药剂浓度与紫萍受害程度的相关反应,测定除草剂活性的生物测定法。本法操作简单,适于脲类等除草剂的测定。以10%Hoagland(1959)营养液配待测除草剂药剂,取10ml倒入100ml的烧杯中每杯放10枚大小一致、不带芽体的紫萍。根据光照、温度条件,培养1~2周后分级调查,计算活性。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条