Based on a fire disaster that happened in a extra-long tunnel under construction,the author analyses on the problems in the emergency rescue,and recommends a layout scheme of the emergency facilities for fire extinguishing,communications,escape,rescue as well as some requirements on emergency exit,ventilation and emergency maneuver.
以一起在建特长隧道火灾事故为例,分析事故救援过程中存在的问题,提出在建长大隧道灭火、通讯、逃生、救援等应急设施的设置方案和对应急通道、通风和演练的要求,对在建隧道的火灾应急准备有现实指导作用。
2) extra-long tunnel
特长隧道
1.
Initial analysis on application of comprehensive supervision technology of extra-long tunnel in Muzhai ridge
浅析木寨岭特长隧道综合勘察技术的应用
2.
On the thoughts in the extra-long tunnel design in Baotashan
宝塔山特长隧道设计中的几点体会
3.
Through the study on the ventilation system of Yangjiao extra-long tunnel,which locates in the west development province road passage from Chongqing to Changsha,connecting Wulong with Shuijiang,especially through the research and analysis on some basic parameter affecting ventilation calculation,the calculation standard of extra-long tunnel is given.
通过西部开发省际公路通道重庆—长沙公路、武隆—水江段羊角特长隧道(长6。
3) super long tunnel
特长隧道
1.
General engineering situation of Wushaoling Super Long Tunnel;
乌鞘岭特长隧道工程概况及其施工
2.
Study on TBM boring technique for construction of super long tunnel;
特长隧道TBM掘进施工技术研究
3.
Firstly,typical natural escape process under four fire scenarios is analyzed according to the fire characteristics of super long tunnel from the viewpoi.
首先根据特长隧道火灾特点,从人员安全疏散的观点出发,模拟分析特长隧道4种不同火灾场景下的典型自然疏散过程,并运用火灾模拟软件FDS计算不同火灾场景、不同横通道间距情况下的危险时间,然后与相应的包含人员疏散行为特征的疏散时间相比较,得出最适宜的横通道间距,并分析其经济性。
4) long tunnel
特长隧道
1.
The 25 km long tunnel with the circular cross-section on high-speed railway was constructed by TBM.
根据高速铁路特长隧道圆形断面尺寸,提出了25km长隧采用TBM全断面施工的基本思路。
2.
Combined with the enginecing case of Jiahuoyan long tunnel, this paper introduces the wateproof principle, the choice of raw material, matching proportion and construction technology of fluid-sprinkle concrete.
结合夹活岩特长隧道工程实例,介绍湿喷混凝土的防水机理、原材料选择、组分配比及施工工艺等。
3.
In tunneling ventilation of long tunnel,the fan was collocated by the maximum ventilation resistance and the maximum air volume of the whole roadway.
特长隧道掘进通风中,通常按照掘进通风最大需求选择风机,然而在掘进工作面较短的情况下,掘进通风机仍在最大功率下运行,造成了极大的能源浪费。
5) super-long tunnel
特长隧道
1.
Taking the 6# incline shaft work in Wuqiaoliang Tunnel as example the mating principles of construction machinery for super-long tunnel are analyzed as well as influencing factors.
以乌鞘岭特长隧道 6号斜井为例 ,分析了特长隧道机械配套的主要原则和因素 ,并对机械设备的需用量进行了计算 ,提出了机械设备配套技术及其管理和应用技术。