1) extra-long single-tracked tunnel
特长单线隧道
1.
It is expounded that by adopting the traditional construction methods (such as full face tunnelling method or lower guide-adit method )and allocating national-made machinery may obtain also stable and high-efficient rapid tunnelling speed for construction of railway extra-long single-tracked tunnels.
本文介绍了在建渝怀铁路最长单线隧道——圆梁山隧道的施工机械配置情况 ,阐明了采用常规施工方法 (全断面法或下导坑法 )及配置国产设备亦能实现铁路特长单线隧道掘进速度的稳产和高产 ,论述了施工机械设备的良好配置是确保特长隧道快速掘进的关键所在 ,同时对今后我国特长单线隧道的机械配置提出几点建议。
2) extra-long tunnel
特长隧道
1.
Initial analysis on application of comprehensive supervision technology of extra-long tunnel in Muzhai ridge
浅析木寨岭特长隧道综合勘察技术的应用
2.
On the thoughts in the extra-long tunnel design in Baotashan
宝塔山特长隧道设计中的几点体会
3.
Through the study on the ventilation system of Yangjiao extra-long tunnel,which locates in the west development province road passage from Chongqing to Changsha,connecting Wulong with Shuijiang,especially through the research and analysis on some basic parameter affecting ventilation calculation,the calculation standard of extra-long tunnel is given.
通过西部开发省际公路通道重庆—长沙公路、武隆—水江段羊角特长隧道(长6。
3) super long tunnel
特长隧道
1.
General engineering situation of Wushaoling Super Long Tunnel;
乌鞘岭特长隧道工程概况及其施工
2.
Study on TBM boring technique for construction of super long tunnel;
特长隧道TBM掘进施工技术研究
3.
Firstly,typical natural escape process under four fire scenarios is analyzed according to the fire characteristics of super long tunnel from the viewpoi.
首先根据特长隧道火灾特点,从人员安全疏散的观点出发,模拟分析特长隧道4种不同火灾场景下的典型自然疏散过程,并运用火灾模拟软件FDS计算不同火灾场景、不同横通道间距情况下的危险时间,然后与相应的包含人员疏散行为特征的疏散时间相比较,得出最适宜的横通道间距,并分析其经济性。
4) long tunnel
特长隧道
1.
The 25 km long tunnel with the circular cross-section on high-speed railway was constructed by TBM.
根据高速铁路特长隧道圆形断面尺寸,提出了25km长隧采用TBM全断面施工的基本思路。
2.
Combined with the enginecing case of Jiahuoyan long tunnel, this paper introduces the wateproof principle, the choice of raw material, matching proportion and construction technology of fluid-sprinkle concrete.
结合夹活岩特长隧道工程实例,介绍湿喷混凝土的防水机理、原材料选择、组分配比及施工工艺等。
3.
In tunneling ventilation of long tunnel,the fan was collocated by the maximum ventilation resistance and the maximum air volume of the whole roadway.
特长隧道掘进通风中,通常按照掘进通风最大需求选择风机,然而在掘进工作面较短的情况下,掘进通风机仍在最大功率下运行,造成了极大的能源浪费。
5) super-long tunnel
特长隧道
1.
Taking the 6# incline shaft work in Wuqiaoliang Tunnel as example the mating principles of construction machinery for super-long tunnel are analyzed as well as influencing factors.
以乌鞘岭特长隧道 6号斜井为例 ,分析了特长隧道机械配套的主要原则和因素 ,并对机械设备的需用量进行了计算 ,提出了机械设备配套技术及其管理和应用技术。