1) single side cantilever construction
单侧悬臂施工
3) cantilever construction
悬臂施工
1.
Effect of temperature on the elevation of main girders during the cantilever construction of long-span bridges;
大跨度桥梁悬臂施工过程中温度对主梁标高的影响分析
2.
Cast-in-site cantilever construction control of a continuous box girder bridge;
连续箱梁桥现浇悬臂施工控制技术
3.
Linear control in cantilever construction of prestressed concrete continuous rigid-framed bridge;
预应力混凝土连续刚构桥悬臂施工线形控制
4) cantilever casting construction
悬臂施工
1.
Using free cantilever casting construction method to build, this bridge is one of the longer span PC continuous rigid frame bridges in china.
该桥集高墩、大跨及窄桥面于一体,施工要求高、技术难度大,因此有必要对悬臂施工线形控制和应力监控进行系统总结,以便为同类桥梁的设计与施工积累建设经验。
5) high-above-ground construction
悬臂梁施工
6) cantilever construction method
悬臂施工法
1.
The characteristics of cantilever construction method are summarized.
以在建的变截面预应力混凝土连续箱梁为研究对象,系统总结了悬臂施工法的特点,通过实践应用提炼出变截面预应力混凝土连续箱梁合理的施工工艺,并针对施工过程中出现的问题提出可行的解决方案。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条