1) Steel and steel fiber reinforced concrete for bridge deck
双钢桥面铺装
2) two-layer deck paving of steel bridge
钢桥面双层铺装
3) Steel bridge deck pavement
钢桥面铺装
1.
The scheme is that using high strength semi-lightweight concrete as the lower floor of the steel bridge deck pavement,by welding shear connectors and binding reinforcement mesh to improve the consistent distortion capability between pavement and steel deck.
提出了新型钢桥面铺装材料与结构设计方案,即利用高强次轻混凝土作为钢桥面铺装下层,通过焊接剪力件、绑扎钢筋网等手段,提高铺装层与钢桥面板协同一致变形能力;同时优化高强次轻混凝土配合比,采用纤维和聚合物增韧增强,改善变形能力和耐久性,综合提高了钢桥面铺装的使用寿命。
2.
After one and a half year s heavy traffic action, it is proved that TIPCO Modified Asphalt SMA does a good job and it is feasible to be applied in steel bridge deck pavement in the south of China.
结合广州内环钢桥面铺装工程 ,对泰普克改性沥青SMA的各项路用性能进行了试验研究 。
3.
Based on the preliminary theoretical analysis,calculation and the laboratory test result,the paper introduces one kind of steel bridge deck pavement structures made of FRP—asphalt concrete.
基于初步理论分析计算和实验室试验结果,文章介绍了一种FRP-沥青混凝土钢桥面铺装结构,指出这种铺装结构具有优于现有钢桥面铺装结构的技术和经济性能,对钢桥面铺装结构的技术创新和工程应用具有一定的使用价值。
4) steel deck pavement
钢桥面铺装
1.
On the repair construction technique of the steel deck pavement
钢桥面铺装修复施工技术
2.
Traffic loading has a great influence on service life of steel deck pavement.
交通荷载对钢桥面铺装的使用寿命有很大影响,为设计出满足超重行车荷载使用要求的钢箱梁桥面铺装,运用有限元方法分析了3种备选铺装结构在超重荷载作用下的力学性能,并进一步研究为改善铺装受力状况而采取的桥梁加固措施,为桥梁结构与桥面铺装一体化设计做出了有益的尝试。
3.
On the basis of present condition of steel deck pavement of Baishazhou Bridge in Wuhan City,the reasons for damaged structure of bridge pavement are analyzed.
针对武汉白沙洲大桥钢箱梁桥面使用现状,对钢桥面铺装结构发生破坏的原因进行了分析,并采用新型防水粘结材料和界面粗糙化处理技术对桥面破坏部分进行了修复方案设计,对修复施工过程中出现的问题进行了总结。
5) steel deck paving
钢桥面铺装
1.
The deterioration between steel deck paving and waterproof layer that is mostly affected by anti-sheer performance of the layer is the most important distress of asphalt pavement,so it has great theoretical and practical effect to study and analyze the interface cohesiveness of waterproof and cohesive layer in views of material and load.
沥青铺装与钢桥面板间的脱层破坏是钢桥面铺装层较常见的一种病害破坏类型,而防水粘结层的层间特性是病害的主导因素,因此,对防水粘结层的层间特性进行分析尤为重要。
6) steel bridge pavement system
钢桥面铺装体系
1.
Long-span steel bridge pavement system is made up of steel bridge deck,asphaltmixture pavement,transverse clapboard,longitudinal clapboard,rib,and main beam.
大跨径钢桥面铺装体系由钢桥面板、沥青混合料铺装层、横隔板、纵隔板、加劲肋及主梁等组成,其关键技术研究包括:钢桥面铺装结构的研究,钢桥面铺装材料性能的研究,钢桥面铺装体系力学特性研究,钢桥面铺装体系疲劳损伤特性研究,钢桥面防腐蚀性能研究以及钢桥面铺装体系的优化设计等,文章综述了近十余年来国内外在这些方面的研究进展,并对进一步研究提出了一些建议。
补充资料:装聋装哑
1.见"装聋作哑"。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条