1) phase change material and insulation material composite configuration
相变-保温结构
2) insulation structure
保温结构
1.
It is pointed out that the thermal conductivities of the components, such as the insulation supporting rings and the insulation structures with densely allocated tacks, shall not be ignored and shall be checked during the insulation structure calculation.
对有保温支持圈和保温钉且其布置密度较大的保温结构进行计算时 ,这些构件的导热能力不能忽略 ,必须进行复
2.
Three kinds of economical buried high tempe rature insulation structures are stud-ied and designed for engineering needs.
作者充分利用传热机理,并结合工程实际需要,设计研究了3种经济型高温直埋保温结构,即组合型复合保温结构、无机复合反射保温结构和多层热隔断高效保温结构,经计算,经济型保温结构总厚度与现用结构相比,可减薄9。
3) insulating structure
保温结构
1.
Different insulating structures such as organic-inorganic insulating structure and compound silicate insulating coating have been premade.
方法对酚醛树酯改性PIR泡沫保温材料进行性能测试,并预制了有机—无机保温结构、复合硅酸盐保温涂料等不同保温结构,在180、220、250℃条件下,采用YYJ120-2-J型热油炉,按GB8174-87标准对各埋地和架空保温试验段进行测试。
2.
The technical problems of directly buried steam pipeline, such as sliding structure, insulating structure, external anticorrosion coating of outer protection steel pipe, fixed support, removal moisture pipe, steam trap pipe, and its installation and operation are discussed with the engineering example.
结合工程实例,探讨了直埋蒸汽管道滑动结构、保温结构、外护钢管外防腐层、固定支座、排潮管、疏水管、蒸汽管道的安装及运行等技术问题。
4) thermal insulation structure
保温结构
1.
In accordance with different characteristics of direct embedded hot water pipeline and direct embedded steam pipeline,checking calculations of stress and strength calculation for the two kinds of pipelines were introduced,the placement methods and the thermal insulation structure of the two kinds of direct embedded thermal pipelines were analyzed and compare
根据直埋热水管道和直埋蒸汽管道的不同特性 ,介绍了两种管道的应力验算及强度计算 ,并对两种直埋热力管道的敷设方式和保温结构进行了分析比较。
5) insulation construction
保温结构
1.
The problems needing attention in the design and construction of directly buried steam pipeline are analyzed in terms of insulation construction,moisture removal pipe,steam trap well,fixing support,pipeline welding and selection of pipeline material,and the relevant solutions are put forward.
从保温结构、排潮管、疏水井、固定节、管道焊接、管道材料选择等方面,分析了在直埋蒸汽管道设计与施工中应注意的问题,提出了解决方法。
2.
The technique of directly buried steam pipeline such as insulation construction, insulating material, outside protective pipe, fixing support, compensator, and steam trap connections is discussed.
探讨了直埋蒸汽管道的保温结构、保温材料、外保护管、固定支座、补偿器、疏水装置等技术。
6) phase transformation
结构相变
1.
Room-temperature ferromagnetism in bulk Co_xTi_(1-x)O_(2-δ) induced by the phase transformation in the hydrogenation sintering process;
Co_xTi_(1-x)O_(2-δ)体材中氢退火引起的铁磁性及结构相变
2.
Controlling TiO_2 phase transformation using NiFe_2O_4 dopant to increase the photocatalytic activity;
利用铁酸镍控制二氧化钛结构相变提高其光催化性能研究
3.
Structural phase transformation from multiwalled carbon nanotubes to nanocrystalline diamond by hydrogen plasma post-treatment was carried out.
采用氢等离子体 ,实现了碳纳米管向金刚石的结构相变 ,并实现了金刚石的高密度成核 ,有效成核密度可达10 1 1 /cm2 以上 ,处于目前金刚石成核密度的最高行列 ,为制备优质的金刚石薄膜提供了保证 。
补充资料:负债结构与资产结构对应分析
负债结构与资产结构对应分析
【负债结构与资产结构对应分析】 1.负债结构与资产结构的对应分析要点 (l)分析长期资产与长期负债是否平衡 分析指标为长期资产与长期负债的比率,其比值若接近1或等于1,表明长期资产负债对应平衡,双方配置得当。若比值小于1,表明长期资产小于长期负债,长期负债在满足对应资金需求后仍有剩余,这时,应分析剩余资金的数量与去向,若剩余资金数量很大,显然不利于提高银行资金的盈利性,要相应调整资产结构。若其比值大于1,表明长期资产大于长期负债,出现缺口,(这种现象在目前专业我国银行资金营运中比较普遍)这时要从资产负债两方面找出存在资金缺口的原因,可着重分析以下两点:①看购买长期债券与3年以上定期存款是否对应,若前者大于后者,说明用非长期负债购买了长期资产,配置不合理;②看技改贷、基建贷款与3年以上定期存款是否对应,若前者大于后者,说明贷款超来源投放。 (2)分析中期资产与中期负债是否对应平衡 分析指标为中期资产对中期负债的比率,其比值若接近于1或等于1,表明二者之间对应平衡、配置合理。若不等于1,有以下两种情况: ①中期资产与中期负债之比大于1,表明中期资产过多,中期负债不足,要从两方面分析:一看周转贷款+l冶时贷款长期占用部分是否小于或等于向央行年度借款+l庙时借款稳定部分+活期存款稳定部分,若前者大于后者,说明流动资金贷款沉淀过多,缺乏对应来源;二看流动基金贷款是否大于或等于两年以下定期存款,若前者大于后者,说明此项贷款过多,要分析过多的原因。 ②中期资产与中期负债之比小于1,表明中期资产偏少,中期负债有剩余,要分析中期负债剩余的去向。 (3)分析短期资产与短期负债是否对应平衡 分析指标为短期资产对短期负债的比率,其比值若接近或等于1,表明短期资产负债对应平衡、配置合理。若大于1,说明短期资产多于短期负债,短期负债不足,短期资产过多,势必占用中、长期负债来源,提高银行的营运成本。若小于1,说明短期负债多于短期资产,应从以下两方面查找原因: ①从负债方面来看,短期负债与短期资产失衡可能与存款等负债波动性较强有关,故首先要分析存款波动率过大的原因。可从银行内外两方面分析:从内部检查存款增长机制方面存在哪些问题;从外部检查生产、收入、物价、利率、社会心理、消费习惯等因素对存款波动的影响。其次要分析向央行临时借款的稳定性,看是本身资金计划性不强、头寸不均衡所致,还是受央行资金波动的影响。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条