2) discharge tunnel at the left bank
左岸泄洪洞工程
4) spillway tunnel
泄洪洞
1.
Shape optimization for pressure outlet transition section and working gate chamber of spillway tunnel;
泄洪洞有压出口渐变段及工作闸门室体型优化
2.
Basic flow pattern in horizontal rotary flow spillway tunnels and its influencing factors;
水平旋流泄洪洞的基本流态与影响因素
3.
Research on shape optimization for flip bucket of spillway tunnel for Xiluodu Hydropower Station;
溪洛渡水电站泄洪洞出口挑流鼻坎体型优化研究
5) flood discharge tunnel
泄洪洞
1.
Research for the Optimization test of outlet of flood discharge tunnel in Narrow Water Course with Large Included Angle;
窄河道大交角泄洪洞出口体型优化试验研究
2.
Smooth blasting technology for flood discharge tunnel of Xiluodu Hydropower Station on right bank
溪洛渡水电站右岸泄洪洞光面爆破技术
3.
The aerators are widely used in flood discharge tunnels and spillways to prevent the cavitation damage of the structures,and air is sucked by flow from the bottom in normal aerator.
龙抬头明流泄洪洞采用常规的底部掺气设施,容易在反弧末端下游附近侧墙处形成掺气盲区,从而导致该侧墙的空蚀破坏,反弧末端下游侧墙是龙抬头明流泄洪洞掺气减蚀设计的重点和难点。
6) discharge tunnel
泄洪洞
1.
Experimental study on water-wing phenomena for middle-piers of discharge tunnels;
泄洪洞中墩水翅现象的试验研究
2.
Hydraulics experiment study of Jiudianxia discharge tunnel s sudden enlargement and bottom drop types;
九甸峡泄洪洞突扩跌坎体型的水力学试验
3.
Hydraulic characteristics of throat-type energy dissipater in discharge tunnels;
洞塞泄洪洞的水力特性研究
补充资料:泄洪洞
见水工隧洞。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条