1) spillway tunnel
泄洪隧洞
1.
Measurement and calculation of air concentration distribution of self-aerated flow in spillway tunnel;
明流泄洪隧洞中自掺气水流浓度分布及其计算
2.
Studies on Aeration Mitigation Cavitation and Energy Dissipation & Erosion Control and their applications in the 1~(#) spillway tunnel of Zip;
泄洪隧洞掺气减蚀与挑流消能机理研究及其在紫坪铺水利枢纽工程1~#泄洪排沙隧洞中的应用
2) flood discharge tunnel
泄洪隧洞
1.
There are two methods namely flood discharge tunnel and spillway selected and compared for flood discharge structure of the Hengquan Reservoir Project.
横泉水库枢纽工程泄洪建筑物比选泄洪隧洞方案和溢洪道方案 ,通过工程地质、结构型式、施工条件、运行管理、工程投资等多方面综合分析 ,最终选用泄洪隧洞方案。
2.
The flood discharge process of 3# flood discharge tunnel at Xiluodu Power Station in Jinsha River has been simulated successfully by means of k-ε turbulence model and VOF(Volume of Fluid)methods.
采用VOF法和k-ε紊流模型相结合对金沙江溪洛渡水电站3#泄洪隧洞泄洪过程进行了数值模拟,针对设计体型存在的第二、第三级掺气坎的掺气空腔长度和高度偏小,龙落尾段的水流流速过高,空化数局部偏小的问题,优化了泄洪隧洞奥奇段体型,调整了掺气坎的布置,使泄洪隧道压强分布更趋均匀,空化数分布趋于平稳,从而改善了泄洪隧洞水流的空蚀空化特性。
3) discharge tunnel
泄洪隧洞
1.
Compared with several design schemes for discharge tunnel of Hongjiadu Hydropower Station,the third optimum scheme was selected because it is suitable for the natural conditions and operation requirement.
洪家渡水电站泄洪隧洞的设计优化,经多种设计方案的比较论证,优选出适宜于该洞自然条件和运行要求的方案三。
4) flood-releasing tunnel
泄洪隧洞
1.
Design and use of narrow joint bucket at the flood-releasing tunnel outlet of the Binghanghe Reservoir Control Project;
窄缝挑坎在丙巷河水库枢纽泄洪隧洞出口的设计应用
5) flood-discharge tunnel
泄洪隧道
6) spillway tunnel
泄洪洞
1.
Shape optimization for pressure outlet transition section and working gate chamber of spillway tunnel;
泄洪洞有压出口渐变段及工作闸门室体型优化
2.
Basic flow pattern in horizontal rotary flow spillway tunnels and its influencing factors;
水平旋流泄洪洞的基本流态与影响因素
3.
Research on shape optimization for flip bucket of spillway tunnel for Xiluodu Hydropower Station;
溪洛渡水电站泄洪洞出口挑流鼻坎体型优化研究
补充资料:泄洪洞
见水工隧洞。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条