1) design general contract
设计总承包
1.
Based on the above situation,this paper provides some suggestions such as using design general contract to coordinate each design units and improve the design quality,strengthening the project pre-planning,establishing feasible project management plan and implementing organization plan to promote the scientization and standardization of the construction management.
基于上述情况,提出采用设计总承包协调各设计单位工作、提高设计质量,加强项目前期策划工作,制定切实可行的项目管理计划和实施组织计划,促进施工管理的科学化、规范化,实行施工总承包模式,简化地方政府管理难度,保证施工质量的建议。
2) design-build delivery method
设计施工总承包
1.
Discussion on the design-build delivery method bidding;
设计施工总承包招标探讨
3) D-B
设计-施工总承包
1.
Application of D-B Model to Construction of the South Anchor of Wuhan Yangluo Changjiang Highway Bridge;
设计-施工总承包在武汉阳逻长江大桥南锚碇工程中的应用
4) Design-build general contracting
设计-建造总承包
1.
Under Design-build general contracting mode,contractor takes great risk.
在设计-建造总承包模式下,承包商承担的风险非常大。
6) design contractor
设计承包商
补充资料:承包人要求发包人作好施工前的准备工作的权利
承包人要求发包人作好施工前的准备工作的权利:施工前的准备工作是整个工程建设过程的重要组成部分,是保证工程建设按期开工和保证工程质量的一个重要环节。发包人应当按照合同的约定作好施工前的准备工作,包括:于施工前办妥正式工程和临时设施范围内的土地租用、征用申请施工许可证,爆破及临时铁道专用线接岔许可证;确定建筑物(或构筑物)、道路、线路、上下水道的定位标桩、水准点和坐标控制点;开工前,接通施工现场水源,电源和运输道路,并按约定清除施工现场的障碍物;组织有关单位对施工图等技术资料进行审定,并按约定的时间和份数提供给承包人。合同中约定由发包人提供材料和设备的,发包人应按照约定的范围和时间向承包人提供材料和设备。根据《合同法》第283条规定,发包人未按照约定时间和要求提供原材料、设备、场地、资金、技术资料的,承包人可以顺延工程日期。并有权要求赔偿停工、窝工等损失。----------出自《合同法》第283条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条