说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 风化卸荷带
1)  weathered unloading zone
风化卸荷带
1.
This paper introduced the positioning and drilling in deep water area as well as grouting to underwater weathered unloading zone.
介绍了在深水区域进行水上定位钻孔,对水下岩石风化卸荷带进行灌浆试验,及试验遇到的主要问题和解决、处理方法。
2)  unloading and weathering zone
卸荷风化分带
3)  weathering relaxation
风化卸荷
4)  discharge-weathered fracture
卸荷-风化裂缝
1.
It proposes that communicating pores of the bottom conglomerate and the discharge-weathered fracture system of half-weathered rock are main channels of oil and gas transportation by uncomformity.
在不整合类型研究的基础上, 对不整合面及上下岩石结构及特征进行了研究, 将其划分为不整合面之上底砾岩、风化粘土层和半风化岩石三个部分, 提出底砾岩的连通孔隙和半风化岩石的卸荷-风化裂缝系统是不整合输导油气的主要通道。
5)  weathering unloading rock body
风化卸荷危岩体
1.
According to narrow road and bad geological phenomenon of Baoquan pumped storage power station project highway,the paper analyzes bad effects of landslide body,body collapse,weathering unloading rock body to road construction,it also proposes preliminary handling measures,so as to make stability of slide slope.
根据宝泉抽水蓄能电站上库公路场地狭窄、不良地质现象发育的特点,分别从塌滑体、崩塌体及风化卸荷危岩体三种主要的不良地质现象分析了其对道路施工可能会产生的不利影响,并提出了初步的处理措施,以确保公路边坡的稳定性。
6)  unloading zone
卸荷带
1.
Focused on the characteristics and numerical simulation of slope unloading zone in the Shuibuya hy-dropower project dam site area,the engineering geological exploration and rock mechanics experiment for thedam site of Shuibuya project are carried out.
围绕水布垭工程坝区岸坡卸荷带类型划分及其成因数值仿真,开展了工程地质调查、岩石力学室内外测试和试验、数值模拟分析和工程应用的研究。
补充资料:风化
分子式:
CAS号:

性质: 当空气中的水蒸气分压低于水合盐的离解压力时,水合盐失去水,它的表面被一层低水合物或无水盐覆盖的现象。如Na2CO3·10H2O及Na2SO4·10H2O。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条